Smartec CLD18
Electrical connection
Hauser
21
6.2
Ensuring the degree of protection
Guarantee the degree of protection as follows:
1. Verify that the O-ring is seated correctly in the housing cover.
2. Screw the housing cover tight until the stop.
3. Screw the cable glands tight.
6.3
Post-connection check
Once you have performed the electrical connections, carry out the following checks :
Instrument status and specifications
Notes
Are the transmitter and cables free from damage on the outside?
Visual inspection
Electrical connection
Notes
Are the installed cables strain-relieved and not twisted?
Is the cable run correct, without loops and cross-overs?
Are the signal cables correctly connected as per the wiring diagram?
Are all the cable entries fitted, tightened and leak-proof?
Are the PE distributor blocks grounded (if present)?
Grounding is carried out at the point
of installation.