3 Installation
PROline Promag 10
10
Hauser
3
Installation
3.1
Incoming acceptance, transport, storage
3.1.1
Incoming acceptance
On receipt of the goods, check the following points:
•
Check the packaging and the contents for damage.
•
Check the shipment, make sure nothing is missing and that the scope of supply
matches your order.
3.1.2
Transport
Please note the following when unpacking or transporting to the measuring point:
•
The devices must be transported in the container supplied.
•
Do not remove the protective covers or caps on the process connections before
installation. This applies especially to sensors with a Teflon lining!
Special notes on flanged devices
"
Caution!
•
The wooden covers mounted on the flanges before the device leaves the factory
protect the linings on the flanges during storage and transportation. Do not remove
these covers until
immediately before
the device is installed in the pipe.
•
Do not lift flanged devices by the transmitter housing or at the connection housing of
the remote version when transporting.
Transporting flanged devices (DN
≤
300):
Use webbing slings slung round the two process connections (Fig. 3). Do not use
chains as they could damage the housing.
#
Warning!
Risk of injury if the measuring device slips! The center of gravity of the assembled
measuring device might be higher than the points around which the slings are slung.
At all times, therefore, when transporting, make sure that the device does not
unexpectedly turn around its axis or slip.
Fig. 3:
Transporting sensors with DN
≤
300
F06
-x
x
x
x
x
x
x
x
-22-
00-
00
-x
x-
00
2