Installation
Proline 500 PROFINET
16
Hauser
4.5
Transmitter post-installation check
The post-installation check must always be performed after the following tasks:
• Mounting the transmitter housing:
– Post mounting
– Wall mounting
• Turning the transmitter housing
• Turning the display module
Is the device undamaged (visual inspection)?
Turning the transmitter housing:
• Is the securing screw firmly tightened?
• Is the connection compartment cover screwed on tightly?
• Is the securing clamp firmly tightened?
Turning the display module:
• Is the connection compartment cover screwed on tightly?
• Is the securing clamp firmly tightened?
Post and wall mounting:
Are the securing screws firmly tightened?