Users’ Manual 

EAN-26MH Horizontal inclinometer system  

  

  

 

Page

 | 

12

 

 

 

2.19 

Remove the protective cap from the access tube. Disengage the threaded adaptor from the 
casing end cap.  

2.20 

Connect and fix the dummy probe to the threaded adaptor and other end to the operating cable 
to pull the probe through the access casing. 

2.21 

Pass dummy probe to check the correctness of casing jointing after assembling casings of 3 m 
each.  

NOTE:  

Make sure to pass the SS pulling wire through the casings while assembling the same. This 
wire shall remain permanently inside the access casing to facilitate pulling of dummy and 
main probes.  

 

2.22 

Secure the jointed casings on the marked alignment either using a tie wire or nylon cable ties to 
the reinforcement cage/horizontal borehole. This securing is essential as the casings might get 
shifted in any random direction during pouring of concrete.   

NOTE: 

Maintain one pair of groove parallel to the horizontal 
plane/surface. This  would ensure that the major  set of groove, 
which shall be used for passing the inclinometer probe, is 
perpendicular to the base slab. Maintain this orientation all 
through the casing alignment.  

CAUTION:

  Ensure that the orientation of major  set of groove remains 

perpendicular to the base slab, right from the first casing laid, to 
the last one, at the other end of the alignment i.e. it should be maintained perpendicular all 
across the diameter of the base slab. This is essential to get correct data. 

 NOTE:  

Prolonged exposure of casing to direct sunlight should be avoided. During assembly, 
casings yet not covered under concrete shall always be kept covered with a vinyl cover to 
protect from direct sunlight. It should also be protected against any type of impact during the 
installation process. 

 

2.23 

Keep the ends of the casings covered by using the special protective caps provided. Cover the 
ends during the assembly process- if the tubing is being left unattended.  

NOTE:  

Make sure that during pouring of concrete on the base slab, concrete is not poured directly 
over the access casings. This might distort or even damage the casings.  

2.24 

Flush inside of casing with clean water after concreting. This will wash away any type of dirt, 
debris, concrete sap, rivet heads etc. 

NOTE:  

It is recommended to again flush the hole with water just before commencing the 
monitoring. Also pass a wooden ‘dolly’ to check for seepage of concrete sap, if any.

  

Figure 11 – Pull cable with threaded adaptor fixed to protective cap 

A+

A-

Summary of Contents for EAN-26MH

Page 1: ...ough ingenuity USERS MANUAL ENCARDIO RITE ELECTRONICS PVT LTD A 7 Industrial Estate Talkatora Road Lucknow UP 226011 India P 91 522 2661039 42 Email geotech encardio com www encardio com International...

Page 2: ...5 2 5 Inclinometer probe model EAN 26MH 2 1 5 2 6 Inclinometer datalogger model EDI 53 INS Error Bookmark not defined 2 7 Dummy probe model EAN 26MH 2 2 7 2 8 Calibration check jig model EAN 26MH 2 3...

Page 3: ...s a readout device The recommended phone types have a large pixel with colour display and a capacitive touch screen that makes it easy to read the display while logging bore holes using Encardio rite...

Page 4: ...ng this instruction manual However the best of instruction manuals cannot provide for each and every condition in the field which may affect performance of the sensor Also blindly following the instru...

Page 5: ...inclinometer cable reel end The protective end cap incorporates a threaded adaptor 2 4 Protective cap model EAN 26MH 1 5 End cap for pull cable reel end The protective end cap incorporates a removabl...

Page 6: ...investigate any anomaly immediately at site 2 6 1 Mobile phone datalogger minimum requirements A mobile phone that is intended for use as readout unit for the digital inclinometer should have the foll...

Page 7: ...ll inclinometer probe from the other end The pulling cable has one end with a threaded connector which is used to connect dummy or inclinometer probe or to an end cap which is used as a cover for ABS...

Page 8: ...Installation accessories Model EAN 26MH 1 6 pop rivets for ABS tubing Model EAN 26MH 1 7 pop rivet gun Model EAN 26MH 1 8 power drill machine with 3 2 mm drill bit Model EAN 26MH 1 9 sealing accessori...

Page 9: ...tc to make the alignment horizontal wherever required 2 5 Mark the outside of each casing as the top groove and start assembling 2 6 Pass the threaded adaptor of pull cable reel through the first acce...

Page 10: ...mastic tape has to be applied should be clean Proper sealing by mastic tape is necessary to prevent intrusion of concrete sap inside the casing One round of mastic tape with a least 10 mm of overlap...

Page 11: ...nd The loop of the pull cable is then guided over the end of the pin and the pin is screwed back to the cap to anchor the pull cable Figure 9 shows how the loop of the pull cable at the cable reel end...

Page 12: ...casing alignment CAUTION Ensure that the orientation of major set of groove remains perpendicular to the base slab right from the first casing laid to the last one at the other end of the alignment i...

Page 13: ...the required length 2 26 If installed in the trench backfill the remainder of the horizontal borehole with finely graded material or select fill Compact by hand 2 27 Mark inclinometer identifications...

Page 14: ...Manual EAN 26MH Horizontal inclinometer system Page 14 4 PREPARATION FOR AND OBTAINING READINGS For detailed instructions refer to section 6 section 7 of Digital Inclinometer operation manual WI 6002...

Page 15: ...nvention strictly Mark casing groove orientation with a permanent ink marker pen on outside of casing and inside of lockable cover While inserting probe into casing the fixed wheels of the probe are k...

Page 16: ...foreground Figure 14 5 3 At pulling end remove the pull cable loop from the protective cap Unscrew the removable pin of the protective cap and take out the loop of the pull cable from the end of the p...

Page 17: ...pring loaded wheel pointing in direction marked A Orient far end wheel of probe in direction A as marked on casing grooves and insert it into access tube up to first mark on the cable Pull probe along...

Page 18: ...alogger in the case 5 21 Rewind cable onto the cable reel clean it and fix the connectors in place 5 22 Replace the two protective end caps and plug on the ends of casing and lock it In case any addit...

Page 19: ...e of the calibration jig using the supplied set of fasteners The calibration jig should be fixed to a vertical wall surface by fixing the mounting brackets to the wall using any commercially available...

Page 20: ...eter probe at one end The anchoring screw S shown alongside is screwed to the retainer cap from outside the inclinometer guide to anchor the inclinometer probe inside the calibration check jig Figure...

Page 21: ...a spray cleaner suitable for electronics that will not damage the outer cable covering or panel finish Replace probe wheels and axles if they become wobbly or sticky Constantly check conditions of O...

Page 22: ...gnored or overlooked the most reliable of instruments and data obtained from them will be rendered useless This method statement does not provide for each and every condition in the field that may aff...

Reviews: