28188-2-0114
Page 9
REMOVE BLOWER COVER
TO GAIN ACCESS FOR BLOWER
INSTALLATION.
NOTE: IF THE BLOWER CAN BE INSTALLED
PRIOR TO FIREBOX INSTALLATION, IT MAY
BE EASIER TO REMOVE THE REAR COVER
PLATE PANEL ON THE BACK OF THE FIREBOX
RATHER THAN REMOVING BRICK PANELS.
OPTIONAL SINGLE SPEED BLOWER INSTALLATION INSTRUCTIONS
Attention:
Install blower assembly before connecting gas inlet
supply line.
Wiring
The appliance, when installed, must be electrically grounded in
accordance with local codes or, in the absence of local codes,
with the
National Electrical Code, ANSI/NFPA 70
, if an external
electrical source is utilized.
This appliance is equipped with
a three-prong [grounding] plug for your protection against
shock hazard and should be plugged directly into a properly
grounded three-prong receptacle. Do not cut or remove the
grounding prong from this plug.
For an ungrounded receptacle,
an adapter, which has two prongs and a wire for grounding, can be
purchased, plugged into the ungrounded receptacle and its wire
connected to the receptacle mounting screw. With this wire com-
pleting the ground, the appliance cord plug can be plugged into the
adapter and be electrically grounded.
Caution:
Label all wires prior to disconnection when servic-
ing controls. Wiring errors can cause improper and dangerous
operation. Verify proper operation after servicing.
Note:
Junction box on right side of firebox must be pre-wired at
time of firebox installation for use with blower assembly. A
standard wall ON/OFF wall switch or optional SCV1 Vari-
able Speed Control Kit should be installed to activate power
to the Firebox, and control the operation of the FBB5 Blower
assembly. It is recommended that installation of the wiring
be performed by a qualified electrician.
See Figure 12.
1. If installed, turn OFF gas supply to firebox/gas log.
2. If applicable, turn OFF electric supply to firebox.
CAUTION:
ALL WIRING SHOULD BE DONE BY A QUALI
-
FIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH
ALL LOCAL, CITY AND STATE BUILDING CODES. BEFORE
MAKING THE ELECTRICAL CONNECTION, MAKE SURE
THAT MAIN POWER SUPPLY IS DISCONNECTED. THE
APPLIANCE, WHEN INSTALLED, MUST BE ELECTRICAL
-
LY GROUNDED IN ACCORDANCE WITH LOCAL CODES,
WITH THE NATIONAL ELECTRICAL CODE ANSI/NFPA 70
(LATEST EDITION).
A factory installed junction box is located on the lower right
side of the firebox. Wiring must be fed to the junction box and
attached to the receptacle that is provided. From right side of
the firebox, remove the screw securing the junction box as
-
sembly. Leave approximately 6” of wire in the junction box for
connection.
Attach black wire to one side of the receptacle and white wire
to opposite side of receptacle. The ground wire should be at-
tached to the green (ground) screw.
Install the receptacle into the junction box. Attach cover
plate.
Attention:
If installed, do not damage gas inlet supply line
when blower assembly is inserted into firebox. In some cases,
removal the gas inlet supply line may be necessary.
Figure 12
Select Firebox Models
Figure 13
NOTE: BLOWER COVER REMOVED
TO SHOW INSTALLATION
OF BLOWER ACCESSORY
Figure 14