background image

24117-0-0508

Page 6

Any vent-free Gas Log Heater must be “For use with approved 

ANSI Z21.11.2 unvented room heater.”
Follow and complete the installation instructions of the gas log set 

and the requirements of this firebox.
Check all fittings for leaks before lighting the gas log set.
In  planning  the  installation  for  the  firebox,  it  is  necessary  to 

determine where the unit is to be installed and whether optional 

accessories are desired. Gas supply piping should also be planned 

at this time.

A gas shut off must be in this line.

The firebox can be mounted on any of these surfaces:

1.  A flat hard combustible or non-combustible surface.

2.  A  raised  platform  of  combustible  or  non-combustible 

material.

3.  Recessed into the floor as illustrated by

 Figure 4

.

4.  Supported under all (4) corners of the firebox so that contact 

is made on all four perimeter edges on the bottom of the unit 

(Example: Four (4) concrete masonry blocks).

If  the  firebox  is  installed  directly  on  carpeting,  tile  or  other 

combustible material other than wood flooring, it should be installed 

on a metal or wood panel extending the full width and depth of 

the unit.
At this point, you should have decided what components to include 

in your installation, and where the firebox is to be located. If this 

has not been done, stop and consult your dealer for assistance with 

this planning.

Planning Your Installation

Accessory kits such as the FBB5 Blower kit, Trim kits, Mantles, 

plus other Decorative Frame, Hood, and Door accessory kits may 

be installed after the firebox is secured to the framing.

Refer  to  the  instructions  provided  with  each  of  the  optional 

accessory kits for proper installation and operation.

Firebox Framing

Firebox  framing  can  be  built  before  or  after  the  firebox  is  set 

in place. Framing should be constructed to accommodate wall 

Figure 4 

Figure 5

FIREBOX INSTALLATION INSTRUCTIONS

FLUSH FACE

LOUVERED

COMBUSTIBLE MATERIALS ALLOWED

Premium Vent-Free Firebox Framing Dimensions (in 

inches)

"A"

"B"

"C"*

Model

Framing 

Height

Framing 

Width

Framing 

Depth

VFP36SB

41 1/2"

40"

23"*

VFP36PB

41 1/2"

39"**

23"*

Attention: 

Add height of base to "A" Dimension when elevat-

ing firebox if installing on an elevated base.

Framing dimension A incudes a three inch clearance for 

standoffs on firebox.

*Dimension "C" assumes use of 1/2" wall board flush to both 

front faces.

** Peninsula model framing width assumes use of 1/2" wall 

board flush to the end face.

A

B

C

A

B

C

Framing - Peninsula

Framing - See-Through

covering and firebox facing material. The firebox framing should 

be constructed of 2 x 4 lumber or heavier. The framing headers 

may rest on the top of the firebox standoffs. Refer to 

Figure 5 

for 

firebox framing dimensions.

Note:

 On Peninsula models, a maximum weight of 250 lbs. is 

recommended when construction materials are supported by the 

top standoff spacers.

Summary of Contents for VFP36PB2EF-1

Page 1: ...y or the gas supplier Carefully review the instructions supplied with the decora tive type unvented room heater for the minimum replace size requirement DO NOT INSTALL A VENT FREE LOG SET IN THIS FIRE...

Page 2: ...ection 9 Wiring Instructions for Installing a Dual Switch Receptacle 10 LK2 Accent Light Accessory 10 Optional Single Speed Blower Installation Instructions 11 13 Maintenance 13 Parts List 14 See Thro...

Page 3: ...val of such component part or accessory Any such action may create a possible re hazard Consult your local building codes Firebox Screen The rebox screen must be in place when the rebox is operating I...

Page 4: ...top standoff screws on the front edge of the top outer wrap See Figures 2a and 2b CLEARANCES FIREBOX STAND OFF COMBUSTIBLE FINISHED WALL OR MANTEL 2 X 4 HEADER TOP OUTER WRAP FINISH WITH TRIM KIT OR N...

Page 5: ...ALLOWED 22 8 20 6 18 5 16 3 14 2 24 0 FIREBOX FACE EXTENDED HOOD VB4H SERIES NOT AVAILABLE ON PENINSULA OPEN END 3 8 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX CLEARANCES Ceiling Clearanc...

Page 6: ...dealer for assistance with this planning Planning Your Installation Accessory kits such as the FBB5 Blower kit Trim kits Mantles plus other Decorative Frame Hood and Door accessory kits may be install...

Page 7: ...D 25 1 2 25 1 2 25 1 2 25 1 2 E 36 36 36 36 F 34 1 4 35 1 4 34 1 4 35 1 4 G 29 1 8 29 1 8 29 1 8 29 1 8 H 41 1 8 41 1 8 41 1 8 41 1 8 I 1 1 4 1 1 4 1 1 4 1 1 4 J 6 1 8 6 1 8 6 1 8 6 1 8 K 8 1 2 8 1 2...

Page 8: ...rposes the hoods are located behind the upper louver s or inside the rebox on ush face units If brass stainless steel or hammered pewter hoods are desired they can be purchased as an option Attachment...

Page 9: ...w c This is in addition to the regulator tted to the log set WARNING CONNECTION DIRECTLY TO AN UNREGULATED L P TANK CAN CAUSE EXPLOSION Install only a ANSI Z21 11 2 vent free log set into this rebox...

Page 10: ...3 wire conductor with ground is recommended however 2 two wire conductors with grounds may be used in place of a 3 wire conductor with a ground if the black wires from the Accent Light and blower acc...

Page 11: ...If installed turn OFF gas supply to rebox gas log 2 If applicable turn OFF electric supply to rebox CAUTION ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH ALL LO...

Page 12: ...mbly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the junction box receptacle previously installed in...

Page 13: ...ROL SWITCH 1 2 A B 110 VOLT AC JUNCTION BOX WHITE FAN SWITCH BLACK FAN MOTOR ASSEMBLY Figure 18 Figure 19 Keep the control compartment logs and burner area surrounding the logs clean by vacuuming or b...

Page 14: ...8807 18807 18807 18807 LOUVER ASSEMBLY UPPER 13 18808 18808 18808 18808 LOUVER ASSEMBLY LOWER 14 24059 24059 UPPER LOUVER ASSEMBLY 15 24058 24058 LOWER LOUVER ASSEMBLY 16 19990 19990 19990 19990 BLOWE...

Page 15: ...24117 0 0508 Page 15 SEE THROUGH FIREBOX PARTS VIEW 1 2 3 4 5 8 7 8 9 11 12 13 16 17 18 19 20 22 7 24 23 27 23 12 13 9 11 24 20 19 18 27 17 3 4...

Page 16: ...24117 0 0508 Page 16 PENINSULA FIREBOX PARTS VIEW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 25 26 23 24 27 12 23 24 13 9 11 3 4 20 19 18 17...

Page 17: ...ewter For use with See Through models VFP36SB2E L F ONLY Contact dealer for all available optional frame kits Bottom Trim Strip Available as optional kits in Black Brass Ham mered Pewter and Stainless...

Page 18: ...and nishes Contact dealer for all available mantel options Flush Panel Kits Flush panel kits may be used to replace louvered panels as desired for the See Through and Peninsula rebox models Available...

Page 19: ...8 29 1 8 29 1 8 29 1 8 H 41 1 8 41 1 8 41 1 8 41 1 8 I 1 1 4 1 1 4 1 1 4 1 1 4 J 6 1 8 6 1 8 6 1 8 6 1 8 K 8 1 2 8 1 2 8 1 2 8 1 2 L 6 6 6 6 M 27 5 8 27 5 8 27 5 8 27 5 8 N 36 7 8 36 7 8 36 7 8 36 7...

Page 20: ...D 3 8 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX Combustible material clearance from front of rebox 36 minimum Sidewall Clearances The clearance from the inside of the rebox to perpendicu...

Page 21: ...Dimension when elevating rebox if installing on an elevated base Framing dimension A incudes a three inch clearance for standoffs on rebox Dimension C assumes use of 1 2 wall board ush to both front f...

Page 22: ...24117 0 0508 Page 22 SERVICE NOTES...

Page 23: ...24117 0 0508 Page 23 SERVICE NOTES...

Page 24: ...Page 24 EMPIRE EMPIRE Comfort Systems Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 PH 618 233 7420 or 800 851 3153 FAX 618 233 7097 or 800 443 8648 info empirecomfort com www empir...

Reviews: