background image

24117-0-0508

Page 10

WIRING INSTRUCTIONS FOR INSTALLING A DUAL SWITCH / RECEPTACLE

In order to install both the optional Blower and Accent Light ac-

cessories, it will be necessary to install the junction box so that 

the Duplex Receptacle wiring is split. This will allow each side of 

the receptacle to operate independently off separate wall switches. 

See diagram below.

Note:

  To  operate  the  FBB5  Blower  accessory  with  a  variable 

speed control, the SCV1 Variable Speed Control Kit should be in-

stalled to control the power to one side of the duplex receptacle.

#1

ACCENT LIGHT

WALL SWITCH

#2

BLOWER

WALL

SWITCH

REMOVE TAB ON HOT SIDE

OF DUPLEX RECEPTACLE

TO SPLIT LUGS

PLUG

FOR

CONTROLS

PLUG

FOR

BLOWER

FIREPLACE

CONTROL

COMPARTMENT

DUAL SWITCH ELECTRICAL WIRING TO FIREPLACE RECEPTACLE

RED

BLACK

WHITE

3-WIRE, GROUNDED

CONDUCTOR

(BY OTHERS)

DOUBLE SWITCH BOX

(INSTALLER PROVIDED)

BLACK

WHITE

GROUND

TO 120V

CIRCUIT

BREAKER

LK2 ACCENT LIGHT ACCESSORY

1.  To wire Junction Box Receptacle, remove the tab on the side 

of the receptacle (hot side) to split receptacle. This will be 

required to separate blower and Accent Light circuits.

2.  Power for switched and live sides of Duplex Receptacle must 

come from the same power source. (One circuit breaker on 

main panel must switch all power off.)

3.  From the wall box to the fireplace a 3-wire conductor with 

ground is recommended, however (2) two-wire conductors 

with grounds may be used in place of a 3-wire conductor with 

a ground if the black wires from the Accent Light and blower 

accessories are identified.

4.  Two wall switches may be used to activate the two receptacle 

plugs independently.

Note: 

Wiring to the Junction Box should be run through the 7/8" 

diameter access hole located on one of the sides of the fireplace 

outer wall. A Romex type connector is provided and should be 

used to protect and restrain the wiring where it passes through 

the fireplace outer wall. The Junction Box should be positioned in 

the lower compartment of the fireplace/firebox so that it does not 

interfere with moving parts of the blower assembly. The Junction 

Box incorporates magnets on the bottom side to retain and reduce 

the chance of movement or vibration during blower operation.

Note: 

If only the blower option is to be installed, wiring may be 

performed as described and illustrated in the following Blower 

Installation section.

An Accent Light Kit model LK2 is available for installation in 

the top of the firebox. Providing the junction box has been pre-

wired with separate circuits as described in the "Wiring for a dual  

switch/receptacle" section, the Accent Light kit may be installed 

at any time on louvered models, or on flush panel models prior to 

the upper panels being covered with finishing materials.

Follow the instructions provided with the LK2 Accent Light kit 

for proper installation in the fireplace/firebox.

Summary of Contents for VFP36PB2EF-1

Page 1: ...y or the gas supplier Carefully review the instructions supplied with the decora tive type unvented room heater for the minimum replace size requirement DO NOT INSTALL A VENT FREE LOG SET IN THIS FIRE...

Page 2: ...ection 9 Wiring Instructions for Installing a Dual Switch Receptacle 10 LK2 Accent Light Accessory 10 Optional Single Speed Blower Installation Instructions 11 13 Maintenance 13 Parts List 14 See Thro...

Page 3: ...val of such component part or accessory Any such action may create a possible re hazard Consult your local building codes Firebox Screen The rebox screen must be in place when the rebox is operating I...

Page 4: ...top standoff screws on the front edge of the top outer wrap See Figures 2a and 2b CLEARANCES FIREBOX STAND OFF COMBUSTIBLE FINISHED WALL OR MANTEL 2 X 4 HEADER TOP OUTER WRAP FINISH WITH TRIM KIT OR N...

Page 5: ...ALLOWED 22 8 20 6 18 5 16 3 14 2 24 0 FIREBOX FACE EXTENDED HOOD VB4H SERIES NOT AVAILABLE ON PENINSULA OPEN END 3 8 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX CLEARANCES Ceiling Clearanc...

Page 6: ...dealer for assistance with this planning Planning Your Installation Accessory kits such as the FBB5 Blower kit Trim kits Mantles plus other Decorative Frame Hood and Door accessory kits may be install...

Page 7: ...D 25 1 2 25 1 2 25 1 2 25 1 2 E 36 36 36 36 F 34 1 4 35 1 4 34 1 4 35 1 4 G 29 1 8 29 1 8 29 1 8 29 1 8 H 41 1 8 41 1 8 41 1 8 41 1 8 I 1 1 4 1 1 4 1 1 4 1 1 4 J 6 1 8 6 1 8 6 1 8 6 1 8 K 8 1 2 8 1 2...

Page 8: ...rposes the hoods are located behind the upper louver s or inside the rebox on ush face units If brass stainless steel or hammered pewter hoods are desired they can be purchased as an option Attachment...

Page 9: ...w c This is in addition to the regulator tted to the log set WARNING CONNECTION DIRECTLY TO AN UNREGULATED L P TANK CAN CAUSE EXPLOSION Install only a ANSI Z21 11 2 vent free log set into this rebox...

Page 10: ...3 wire conductor with ground is recommended however 2 two wire conductors with grounds may be used in place of a 3 wire conductor with a ground if the black wires from the Accent Light and blower acc...

Page 11: ...If installed turn OFF gas supply to rebox gas log 2 If applicable turn OFF electric supply to rebox CAUTION ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH ALL LO...

Page 12: ...mbly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the junction box receptacle previously installed in...

Page 13: ...ROL SWITCH 1 2 A B 110 VOLT AC JUNCTION BOX WHITE FAN SWITCH BLACK FAN MOTOR ASSEMBLY Figure 18 Figure 19 Keep the control compartment logs and burner area surrounding the logs clean by vacuuming or b...

Page 14: ...8807 18807 18807 18807 LOUVER ASSEMBLY UPPER 13 18808 18808 18808 18808 LOUVER ASSEMBLY LOWER 14 24059 24059 UPPER LOUVER ASSEMBLY 15 24058 24058 LOWER LOUVER ASSEMBLY 16 19990 19990 19990 19990 BLOWE...

Page 15: ...24117 0 0508 Page 15 SEE THROUGH FIREBOX PARTS VIEW 1 2 3 4 5 8 7 8 9 11 12 13 16 17 18 19 20 22 7 24 23 27 23 12 13 9 11 24 20 19 18 27 17 3 4...

Page 16: ...24117 0 0508 Page 16 PENINSULA FIREBOX PARTS VIEW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 25 26 23 24 27 12 23 24 13 9 11 3 4 20 19 18 17...

Page 17: ...ewter For use with See Through models VFP36SB2E L F ONLY Contact dealer for all available optional frame kits Bottom Trim Strip Available as optional kits in Black Brass Ham mered Pewter and Stainless...

Page 18: ...and nishes Contact dealer for all available mantel options Flush Panel Kits Flush panel kits may be used to replace louvered panels as desired for the See Through and Peninsula rebox models Available...

Page 19: ...8 29 1 8 29 1 8 29 1 8 H 41 1 8 41 1 8 41 1 8 41 1 8 I 1 1 4 1 1 4 1 1 4 1 1 4 J 6 1 8 6 1 8 6 1 8 6 1 8 K 8 1 2 8 1 2 8 1 2 8 1 2 L 6 6 6 6 M 27 5 8 27 5 8 27 5 8 27 5 8 N 36 7 8 36 7 8 36 7 8 36 7...

Page 20: ...D 3 8 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX Combustible material clearance from front of rebox 36 minimum Sidewall Clearances The clearance from the inside of the rebox to perpendicu...

Page 21: ...Dimension when elevating rebox if installing on an elevated base Framing dimension A incudes a three inch clearance for standoffs on rebox Dimension C assumes use of 1 2 wall board ush to both front f...

Page 22: ...24117 0 0508 Page 22 SERVICE NOTES...

Page 23: ...24117 0 0508 Page 23 SERVICE NOTES...

Page 24: ...Page 24 EMPIRE EMPIRE Comfort Systems Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 PH 618 233 7420 or 800 851 3153 FAX 618 233 7097 or 800 443 8648 info empirecomfort com www empir...

Reviews: