background image

25476-5-0612

Page 6

Deluxe Vent-Free Firebox Framing Dimensions (in inches)

"a"

"B"

"c"

Model

Framing Height

Framing Width

Framing Depth

VFD32FB

36 1/8"

35"

17"

VFD36FB

38 1/8"

40"

19 3/8"

VFD42FB

38 1/8"

44"

19 3/8"

Attention:

 Add 3-3/4" to "A" Dimension when using flush mantel base.

Framing dimension A includes a three inch clearance for standoffs on fire

-

box.

any vent-free gas Log Heater must be “For use with approved anSi 

Z21.11.2 unvented room heater.”
Follow and complete the installation instructions of the gas log set 

and the requirements of this firebox.
Check all fittings for leaks before lighting the gas log set.
In planning the installation for the firebox, it is necessary to determine 

where the unit is to be installed and whether optional accessories 

are desired. gas supply piping should also be planned at this time.

A gas shut off must be in this line.

The firebox can be mounted on any of these surfaces:

1.  A flat hard combustible or non-combustible surface.

2.  a raised platform of combustible or non-combustible material.

3.  Recessed into the floor as illustrated by

 Figure 4

 (flush face), 

and 

Figure 5

 (louvered models).

4.  Supported under all (4) corners of the firebox so that contact 

is made on all four perimeter edges on the bottom of the unit 

(example: Four (4) concrete masonry blocks).

If the firebox is installed directly on carpeting, tile or other combustible 

material other than wood flooring, it should be installed on a metal 

or wood panel extending the full width and depth of the unit.

at this point, you should have decided what components to include 

in your installation, and where the firebox is to be located. If this 

has not been done, stop and consult your dealer for assistance 

with this planning.

planning your Installation

Please note that the optional VFa2 Fresh air kit available for use 

with the Vent Free Firebox must be installed at the time of the initial 

installation. Refer to pages 10, 11 and 12 for detailed instructions 

for the air kit.

accessory kits such as the FBB5 Blower kit, trim kits, Mantles, Full 

cabinet Mantels, plus other Decorative Frame, Hood, and Door 

accessory kits may be installed after the firebox is secured to the 

framed opening.

Refer to the instructions provided with each of the optional accessory 

kits for proper installation and operation.

Firebox Framing

Firebox framing can be built before or after the firebox is set in place. 

Framing should be positioned to accommodate wall covering and 

firebox facing material. The firebox framing should be constructed 

of 2 x 4 lumber or heavier. the framing headers may rest on the 

top of the firebox standoffs. Refer to 

Figures 6 and 7

 for firebox 

framing dimensions.

Figure 4

Figure 5

Figure 6

FIREBOX INSTALLATION INSTRUCTIONS

NON-COMBUSTIBLE

FINISHING MATERIAL

TO FIREBOX OPENING

FLUSH FACE

FIREBOX

MODELS

COMBUSTIBLE MATERIALS ALLOWED

LOUVERED

FIREBOX

MODELS

COMBUSTIBLE MATERIALS ALLOWED

Summary of Contents for VFD32FB0F-2

Page 1: ...ireplace size requirement DO NOT INSTALL a vent free log set IN THIS FIREBOX UNLESS THIS FIREBOX MEETS THE MINIMUM DIMENSIONS REQUIRED FOR THE INSTALLATION ANSI Z21 91 Ventless Fireplace Enclosures fo...

Page 2: ...Line Connection 9 Optional Fresh Air Kit Installation Instructions 10 12 Optional Single Speed Blower Installations Instructions 13 15 Junction Box Wiring Installation Instructions 16 Maintenance 16...

Page 3: ...val of such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is opera...

Page 4: ...ustible side wall should not be less than 6 See Figure 1 Firebox Side and Back Clearances The firebox outer casing side and back flanges are zero clearance to combustibles Top Framing and Finishing Co...

Page 5: ...t meet the clearance requirements detailed below Grate Clearance The minimum clearance between the front legs of the grate and front edge of the firebox is 2 Leave at least 36 clearance from the front...

Page 6: ...or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you should have decided what compon...

Page 7: ...16 J 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 K 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 L 31 13 16 36 3 16 38 3 16 31 13 16 36 3 16 38 3 16 M 63 3 8 72 3 8 76 3 8 63 3 8 72 3 8 76 3 8 N 2 11 16 2 11 16 2 11 16...

Page 8: ...desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosen the two screws A holding firebox top to face panel then sl...

Page 9: ...s for proper hole placement After the brick panel knockout is removed the firebox wrap may have a round metal knockout that must be removed also Use a screwdriver to punch out the metal knockout Check...

Page 10: ...ust be installed prior to or at the time of firebox installation to framing The Fresh Air kit must be installed prior to the installation of wall board or other finishing materials around the unit Har...

Page 11: ...tside rain cap hood to the building 2 Secure the 4 dia duct to the Slide Assembly collar on the firebox with band clamps or screws installer supplied 3 Run the other end of the duct through the exteri...

Page 12: ...PREMIUM FIREBOXES 1 2 3 PARTS LIST INDEX NO PART NO DESCRIPTION 1 29259 Outside Air Vent Assembly 2 29257 Slide Assembly 3 29263 Handle Retainer R 3580 PHILLIPS TRUSS HEAD SCREW 10 X QTY 2 R 2737 HEX...

Page 13: ...d Control Kit should be installed to activate pow er to the Firebox and control the operation of the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified...

Page 14: ...wires away from moving parts of the blower assem bly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the...

Page 15: ...move fan and clean blower wheels Warning Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control knob slightly and turn c...

Page 16: ...box Install a UL listed cable clamp not supplied in the knockout hole Leave approximately 6 of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to...

Page 17: ...14 R7051 Rod Screen Qty 2 15 R8137 Screen Curtain Qty 2 16 R8727 Hole Plug 17 25477 Blower Cover Plate 18 25490 Front Panel Flush 18 26444 Front Panel Louvered VFD32FB 0 2 SF 1 17149 Top Standoff Qty...

Page 18: ...le Plug 17 25477 Blower Cover Plate 18 26678 Front Panel Flush 18 26679 Front Panel Louvered VFD36FB 0 2 SF 1 17247 Top Standoff Qty 2 3 10554 Framing Bracket Qty 4 5 17162 Junction Box Assembly 6 R34...

Page 19: ...le Plug 17 25477 Blower Cover Plate 18 26689 Front Panel Flush 18 26690 Front Panel Louvered VFD42FB 0 2 SF 1 17247 Top Standoff Qty 2 3 10554 Framing Bracket Qty 4 5 17162 Junction Box Assembly 6 R34...

Page 20: ...25476 5 0612 Page 20 PARTS VIEW 1 16 4 2 7 6 5 8 12 11 10 9 14 14 17 13 3 15 18 18...

Page 21: ...V 1 Brick Liners Deluxe Firebox Contact dealer for all available optional liner kits Fresh Air Kit 1 2 3 Deluxe and Premium Fireboxes BVA 1 Frame Kits 3 Piece Frame Kits Black Stainless Steel or Hamme...

Page 22: ...ss Steel finishes Contact dealer for all avail able optional louver acces sories Bottom Trim Strip Available as optional kits in Brass Hammered Pew ter and Stainless Steel finishes Contact dealer for...

Page 23: ...st Street Hartford CT 06114 Phone 860 722 2433 Toll Free 800 243 9360 Fax 860 293 0479 Toll Free Fax 800 274 2004 Websites www fwwebb com www victormfg com Parts Heater Hearth and Grills MASTER PARTS...

Page 24: ...ce must be installed by a qualified installer and operated in accordance with the instructions furnished with the ap pliance A bill of sale cancelled check or payment record should be kept to verify p...

Reviews: