background image

25476-5-0612

Page 14

4.  Insert blower assembly into interior, bottom of firebox. Posi

-

tion blower assembly so that you align the notch on back of 

blower assembly with the center screw on firebox back, then 

push the blower assembly against firebox back. The blower 

wheel must be centered with the back wall of the firebox. The 

magnets on the back and bottom of blower assembly will suf-

ficiently hold blower assembly in place.

5.  once the blower assembly is in position, locate the plug but-

ton in the top right rear corner of the firebox. Remove the plug 

with a standard screwdriver and discard plug.

6.  Next, find the fan control switch and wire assembly. Feed the 

wires through the hole at the top of the firebox, and secure the 

fan control switch with (2) #6 screws provided. 

See Figure 23.

7.  The fan control wires will slide down between the firebox and 

outer wrap near the blower assembly. 

See Figure 28

.

8.  one fan control wire will have a 1/4” female terminal that must 

be attached to the open terminal on the blower motor. 

See 

Figure 26, Connection A.

9.  the other fan control wire has a 1/4” male terminal. attach this 

terminal to the open terminal on the blower power cord. 

See 

Figure 26, Connection B

10.  Route the wires away from moving parts of the blower assem-

bly and retain wires together near the blower motor using the 

plastic purse clip provided.

11.  to complete the installation, plug the power cord into the junc-

tion box receptacle at the right rear corner of the firebox outer 

wrap. 

See Figure 24.

12.  if room permits, the power cord can be located from the out-

side of the unit looking through the junction box access hole 

(with the junction box removed), then plug up the power cord 

before reinstalling the pre-wired junction box.

13.  once all connections are made electrically, it is recommended 

that you test the blower fan control operation by turning on 

power to the blower (caution: 110 Volt). then apply heat to 

the fan control switch inside the firebox with a lighter or match 

until blower is activated. once blower is activated, check for 

proper operation. Do not place hands near blower assembly 

or other wiring while power is on.

14.  Replace blower access plate and/or reinstall the brick liner 

panels if provided.

15.  this completes the installation of the optional FBB5 Blower kit 

accessory.

Note: 

this blower is equipped with a heat activated fan control 

switch. Blower will operate when the firebox warms up, and 

will turn off automatically when the firebox cools down.

Figure 23

Figure 24

FAN CONTROL

SWITCH LOCATION

FAN CONTROL WIRES

BLOWER POWER CORD

OpTIONAL SINGLE SpEED BLOwER INSTALLATION INSTRUCTIONS

Summary of Contents for VFD32FB0F-2

Page 1: ...ireplace size requirement DO NOT INSTALL a vent free log set IN THIS FIREBOX UNLESS THIS FIREBOX MEETS THE MINIMUM DIMENSIONS REQUIRED FOR THE INSTALLATION ANSI Z21 91 Ventless Fireplace Enclosures fo...

Page 2: ...Line Connection 9 Optional Fresh Air Kit Installation Instructions 10 12 Optional Single Speed Blower Installations Instructions 13 15 Junction Box Wiring Installation Instructions 16 Maintenance 16...

Page 3: ...val of such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is opera...

Page 4: ...ustible side wall should not be less than 6 See Figure 1 Firebox Side and Back Clearances The firebox outer casing side and back flanges are zero clearance to combustibles Top Framing and Finishing Co...

Page 5: ...t meet the clearance requirements detailed below Grate Clearance The minimum clearance between the front legs of the grate and front edge of the firebox is 2 Leave at least 36 clearance from the front...

Page 6: ...or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you should have decided what compon...

Page 7: ...16 J 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 K 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 L 31 13 16 36 3 16 38 3 16 31 13 16 36 3 16 38 3 16 M 63 3 8 72 3 8 76 3 8 63 3 8 72 3 8 76 3 8 N 2 11 16 2 11 16 2 11 16...

Page 8: ...desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosen the two screws A holding firebox top to face panel then sl...

Page 9: ...s for proper hole placement After the brick panel knockout is removed the firebox wrap may have a round metal knockout that must be removed also Use a screwdriver to punch out the metal knockout Check...

Page 10: ...ust be installed prior to or at the time of firebox installation to framing The Fresh Air kit must be installed prior to the installation of wall board or other finishing materials around the unit Har...

Page 11: ...tside rain cap hood to the building 2 Secure the 4 dia duct to the Slide Assembly collar on the firebox with band clamps or screws installer supplied 3 Run the other end of the duct through the exteri...

Page 12: ...PREMIUM FIREBOXES 1 2 3 PARTS LIST INDEX NO PART NO DESCRIPTION 1 29259 Outside Air Vent Assembly 2 29257 Slide Assembly 3 29263 Handle Retainer R 3580 PHILLIPS TRUSS HEAD SCREW 10 X QTY 2 R 2737 HEX...

Page 13: ...d Control Kit should be installed to activate pow er to the Firebox and control the operation of the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified...

Page 14: ...wires away from moving parts of the blower assem bly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the...

Page 15: ...move fan and clean blower wheels Warning Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control knob slightly and turn c...

Page 16: ...box Install a UL listed cable clamp not supplied in the knockout hole Leave approximately 6 of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to...

Page 17: ...14 R7051 Rod Screen Qty 2 15 R8137 Screen Curtain Qty 2 16 R8727 Hole Plug 17 25477 Blower Cover Plate 18 25490 Front Panel Flush 18 26444 Front Panel Louvered VFD32FB 0 2 SF 1 17149 Top Standoff Qty...

Page 18: ...le Plug 17 25477 Blower Cover Plate 18 26678 Front Panel Flush 18 26679 Front Panel Louvered VFD36FB 0 2 SF 1 17247 Top Standoff Qty 2 3 10554 Framing Bracket Qty 4 5 17162 Junction Box Assembly 6 R34...

Page 19: ...le Plug 17 25477 Blower Cover Plate 18 26689 Front Panel Flush 18 26690 Front Panel Louvered VFD42FB 0 2 SF 1 17247 Top Standoff Qty 2 3 10554 Framing Bracket Qty 4 5 17162 Junction Box Assembly 6 R34...

Page 20: ...25476 5 0612 Page 20 PARTS VIEW 1 16 4 2 7 6 5 8 12 11 10 9 14 14 17 13 3 15 18 18...

Page 21: ...V 1 Brick Liners Deluxe Firebox Contact dealer for all available optional liner kits Fresh Air Kit 1 2 3 Deluxe and Premium Fireboxes BVA 1 Frame Kits 3 Piece Frame Kits Black Stainless Steel or Hamme...

Page 22: ...ss Steel finishes Contact dealer for all avail able optional louver acces sories Bottom Trim Strip Available as optional kits in Brass Hammered Pew ter and Stainless Steel finishes Contact dealer for...

Page 23: ...st Street Hartford CT 06114 Phone 860 722 2433 Toll Free 800 243 9360 Fax 860 293 0479 Toll Free Fax 800 274 2004 Websites www fwwebb com www victormfg com Parts Heater Hearth and Grills MASTER PARTS...

Page 24: ...ce must be installed by a qualified installer and operated in accordance with the instructions furnished with the ap pliance A bill of sale cancelled check or payment record should be kept to verify p...

Reviews: