36092-2-0316
Page 21
36092-2-0316
Page 20
INSTALLATION
FIREPLACE
OPENING
FINISHED
WALL
NON-COMBUSTIBLE
WALL COVERING
(COVER SEAM)
NON-COMBUSTIBLE
WALL COVERING
VERTICAL
FRAMING
HORIZONTAL
FRAMING
NON-COMBUSTIBLE
ZONE
3” ABOVE
VENT
16” NON-COMBUSTIBLE
BOARD HEIGHT - ALL
VISIBLE SIDES
NOTICE
: See Figure 9
on page 13
for maximum mantel depth
and minimum height above fireplace.
Figure 19
Clearance to Combustibles
Back
0in
Sides Near Face (See Figure 20)
0in
Floor
0in
Top Stand-off
0in
Outer Top to Framing
3in
Above Vent
3in
FINISHED
WALL
NON-COMBUSTIBLE
WALL COVERING
VERTICAL FRAMING:
NOTE ORIENTATION OF
STUD AGAINST THE FIREPLACE
20”
FRAMING
ON FLOOR
NON-COMBUSTIBLE
ZONE
NON-COMBUSTIBLE
ZONE
LEAVE SPACE BETWEEEN
WALL COVERING AND
FIREPLACE OPENING FOR
BEAD OF CAULK
Figure 20
INSTALLATION
Framing
1. Before placing the fireplace inside the frame work, or
building the frame work around the fireplace, the top stand-
offs must be formed and secured. Form the top stand-offs in
the sequence shown in
Figure 21
, and secure them to the
firebox outer top using either four (SP) or five (PP) screws
from your hardware pack.
1
2
3
4
STAND-OFFS SHALL
BE FORMED ON THE
UNIT. DO NOT
REMOVE.
Figure 21
2. Attach four (SP) or five (PP) top-side nailing flanges to the
top stand-offs as shown in
Figure 22.
Leave the nailing
flanges flat at this time. Note that while the non-combustible
board provided with this fireplace is ½” thick, some
adjustment of the nailing flange position can be made by
using either the outer or inner pair of holes.
½” OFFSET
5/8” OFFSET
Figure 22
3. If necessary, the positions of the side nailing flanges can
adjusted by loosening (but do not remove) the top and
bottom screws, anchoring the bracket in place using a center
screw from the hardware pack, and re-tightening the top and
bottom screws.
See Figure 23.
1/2” POSITION
5/8” POSITION
Figure 23
4. After the fireplace has been properly positioned inside the
frame work, or the frame work has been built around the
fireplace, the nailing flanges shall be bent 90 degrees and
the fireplace should be attached to the frame work using 24
(SP) or 18 (PP) drywall screws.
Temporarily remove blower access plate and tuck junction
box inside fireplace before setting in place. See Figure 24.
BLOWER ACCESS PLATE
JUNCTION BOX
Figure 24
Figure 25