32261-5-0414
Page 32
FRAMING AND FINISHING (continued)
Vertical Firestops
Vertical runs of this system which pass through ceilings require
the use of ONE ceiling firestop at the hole in each ceiling through
which the vent passes.
Position a plumb bob directly over the center of the vertical vent
component and mark the ceiling to establish the center point of the
vent. Drill a hole or drive a nail through this center point and check
the floor above for any obstructions such as wiring or plumbing
runs. Reposition the appliance and vent system, if necessary, to
accommodate ceiling joists and/or obstructions.
Cut a 10 inch x 10 inch hole through the ceiling, using the center
point previously marked. Frame the hole with framing lumber the
same size as the ceiling joists.
See Figure 63.
If the area above the
ceiling is NOT an attic, position and secure the ceiling firestop on
the ceiling side of the previously cut and framed hole.
See Figure
64.
If the area above the ceiling is an attic, position and secure the
firestop on top of the previously framed hole.
See Figure 65.
NOTE:
Remove insulation from the framed area in the attic before
installing the firestop and/or vent pipes.
EXISTING CEILING JOISTS
NEW FRAMING
CEILING
10”
(254mm)
10”
(254mm)
Figure 63
NAILS, 4 REQUIRED
FIRESTOP
10”
(254 mm)
10”
(254 mm)
Figure 64
Figure 65
See
Vertical Termination
Pages 34 - 35.
Summary of Contents for DVCC32LP
Page 39: ...32261 5 0414 Page 39 Figure 77 MILLIVOLT STANDING PILOT WIRING DIAGRAM BP3 SERIES ...
Page 46: ...32261 5 0414 Page 46 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING BP7 SERIES ...
Page 47: ...32261 5 0414 Page 47 INTERMITTENT PILOT CONTROL SYSTEM TROUBLESHOOTING BP7 SERIES ...
Page 51: ...32261 5 0414 Page 51 MILLIVOLT PARTS VIEW DVCP 32 36 42 BP3 ...
Page 53: ...32261 5 0414 Page 53 IP PARTS VIEW DVCP 32 36 42 BP7 ...