background image

 

~ 7 ~ 

v. 1.03 

 

Section 3:  OPERATION 

 

The normal sequence of operating the CB100 is as follows: 
 

1.

 

Insert a clean, sanitized (See Section 4) freezing tub into the 
freezing cylinder, making sure the rim of the tub engages all 
4 of the round drive lugs and that the rim sits flush with the 
top surface (See Figure 3-1). 

2.

 

Insert the bearing disc, with radiused edge down, into the 
freezing tub. The disc should sit flat and rounded edge of 
disc must match rounded profile of tub bottom. (see Figure 3-
1R).

 

3.

 

Insert the dasher shaft with blade into the tub with the 
hexagonal drive end facing upward. Be sure the round end of 
the shaft goes into the round hole in the bearing disc, and 
push it all the way down until the bottom edge of the blade 
touches the surface of the disc. (See Figure 3-2).

 

 

4.

 

Pour the mix you intend to freeze into the tub. NOTE: do not 
add more than your flavorings and ONE quart of mix to the 
freeze tub.  You do not want overflow out of the top of the 
freeze tub.

 

 

5.

 

Lay the splash plate on top of the dasher. It will fit just inside 
of the freeze tub. (See Figure 3-3). 
 

6.

 

Tilt the churning motor down gently until the driveshaft 
touches the top of the dasher. Let the weight of the churning 
motor rest atop the dasher. (See figures 3-4 and 3-5). When 
you are ready to begin the cycle, simply turn on the motor 
switch, and it will engage with the dasher and drop down  
 
 
 

Summary of Contents for CB-100

Page 1: ...OPERATING MANUAL BATCH FREEZER INSTALLATION OPERATING MAINTENANCE AND CLEANING MANUAL CB 100 Countertop World s Best Built Batch Freezers 100 Made in the U S A by the People Who Invented Them ...

Page 2: ... 100 NOMENCLATURE page 6 Section 3 OPERATION FIGURE 3 1 FIURE 3 1R FIGURE 3 2 FIGURE 3 3 FIGURE 3 4 FIGURE 3 5 FIGURE 3 6 page 7 Section 4 CLEANING AND SANITIZING page 12 Section 5 CARE and MAINTENANCE PHOTO 5 1 page 14 Section 6 PARTS DIAGRAMS FIGURE 6 1 FIGURE 6 2 FIGURE 6 3 FIGURE 6 4 FIGURE 6 5 page 16 Section 7 WARRANTY page 20 ...

Page 3: ...x from the skid by cutting through it as close as possible to the skid then lift it off Look for a small box inside which contains 4 black plastic feet and an Allen wrench to change out blades in the future The machine is held in place by two runners along its sides which have a clip at their middles that hooks into the middle bottom louver on each side of the machine The clips are screwed down to...

Page 4: ... 3 v 1 03 Figure 1 1 Figure 1 2 ...

Page 5: ... 4 v 1 03 Figure 1 3 Figure 1 4 ...

Page 6: ... 5 v 1 03 Figure 1 5 ...

Page 7: ...ure of the machine is that it freezes product in what will be your serving or hardening container Each additional container purchased comes with a bearing disc and a clear lid This machine will produce premium ice cream Italian ices sorbets and gelato in 20 minutes or less per tub Various inclusions can be added prior to churning and or after production in the same container it was just made in To...

Page 8: ...rd Be sure the round end of the shaft goes into the round hole in the bearing disc and push it all the way down until the bottom edge of the blade touches the surface of the disc See Figure 3 2 4 Pour the mix you intend to freeze into the tub NOTE do not add more than your flavorings and ONE quart of mix to the freeze tub You do not want overflow out of the top of the freeze tub 5 Lay the splash p...

Page 9: ... the desired consistency is reached turn the refrigeration timer to the zero 0 position and the compressor will stop Now turn the rocker switch off and the churning motor stops Raise the motor into its upright position Push down firmly on the ejection knob making the freezing tub rise up enough to grasp the rim and remove it from the machine Remove the splash disc and dasher from the freeze tub an...

Page 10: ... 9 v 1 03 Figure 3 1R Figure 3 2 ...

Page 11: ... 10 v 1 03 Figure 3 3 Figure 3 4 ...

Page 12: ... 11 v 1 03 Figure 3 5 Figure 3 6 ...

Page 13: ...e these parts should be either hand cleaned with detergent and warm water or run through a dishwasher The sanitizing is done just prior to use so the parts should be washed dried and stored in a clean place until ready to use the machine When assembling the 4 parts mentioned above for use have a gallon bucket of sanitizing solution ready as well as a roll of paper towels and a clean work surface P...

Page 14: ... paper towels Damp or wet sponges and rags harbor bacteria Wipe up spills and throw away wrappers paper towels or anything that may accumulate After production is complete any spilled product on the outer casing or top of the machine should be wiped up thoroughly and then wiped down with some of the sanitizer that was made earlier Look into the freezing cylinder If there is anything in it includin...

Page 15: ...ions 2 Blade condition the scraping blade is made of food grade high density polyethylene Eventually the surface that touches the freezing tub will wear down When you notice a change in the amount of product being left on the inside surfaces of the freezing tub it will be time to change the blade You should be able to see the gray silver of the tub after each swipe around of the blade There will a...

Page 16: ...rance but equal all around the hole If questionable replace the disc 4 Power cord be sure to keep the power cord routed in a safe path to your outlet If for some reason the cord becomes damaged or frayed or the plug does have an electrician replace the entire cord You can purchase this part from Emery Thompson 5 General cleanliness aside from the normal day to day cleanup of the machine and to kee...

Page 17: ... 16 v 1 03 Section 6 PARTS DIAGRAMS Figure 6 1 Figure 6 2 ...

Page 18: ... 17 v 1 03 Figure 6 3 ...

Page 19: ... 18 v 1 03 Additional Freezing Tub Kit Figure 6 4 ...

Page 20: ... 19 v 1 03 Figure 6 5 ...

Page 21: ... plant of the company located at 15350 Flight Path Drive Brooksville FL 34604 U S A Labor and Transportation Charges Emery Thompson Machine and Supply Company assumes no liability under the warranty for any transportation charges or labor expenses incident to its work under this warranty such transportation expenses and labor costs to be assumed and paid by the Purchaser Use and Care of Machine Pu...

Page 22: ...OLE REMEDY WITH RESPECT TO ANY EMERY THOMPSON FREEZER SHALL BE REPAIR OR REPLACEMENT OF DEFECTIVE COMPONENTS UNDER THE TERMS OF THIS WARRANTY WHAT IS NOT COVERED BY THIS WARRANTY Emery Thompson Machine s sole obligation under this warranty is limited to either repair or replacement of parts subject to the additional limitations below This warranty neither assumes nor authorizes any person to assum...

Page 23: ...OM ELECTRICAL POWER FAILURE THE USE OF EXTENSION CORDS LOW VOLTAGE OR VOLTAGE DROPS TO THE UNIT THERE ARE NO IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE NO DISTRIBUTOR DEALER OR OTHER PERSON IS AUTHORIZED TO MAKE ANY COMMITMENT OR ASSUME ANY LIABILITY ON BEHALF OF EMERY THOMPSON MACHINE AND SUPPLY COMPANY INC BEYOND THIS WARRANTY THERE ARE NO WARRANTIES WHICH EXTEND BEY...

Page 24: ...ard Artisan Gelato all old world water ice ITALIAN ICE sorbet sorbetto products and Dairy Free Ice cream In 2005 we sold our New York facilities to the New York Yankees Organization and built an all new manufacturing facility north of Tampa in Brooksville Florida The factory features state of the art manufacturing techniques and its own TV studio for photo shoots recording and web broadcasting Our...

Reviews: