Section 5:   CARE and MAINTENANCE 

 

Your  model  CB100  requires  very  little  in  the  way  of  care  and 
maintenance.    There  are  some  functions  of  the  machine  that  bear 
paying attention to. 
 
1)  Airflow  -  your  machine  uses  airflow  from  its  surroundings  to 
extract  heat  from  each  batch  of  product  you  make.    So  it  goes  to 
reason that good airflow is imperative to the efficient operation of 
the unit.  After about 100 batches (depending on the environment 
the  machine  is  used  in)  take  a  good  look  at  the  left  side  of  the 
machine, where air is drawn in.  Look past the square perforations 
in  the  stainless  steel  cabinet,  and  check  the  surface  of  the 
condensing coil assembly.  It should be clean and free of dust, lint, 
etc. that may in time accumulate on its surface.  A strong vacuum 
cleaner  with  a  soft  brush  can  be  used  to  loosen  and  pull  out  any 
accumulations. 
 
2) Blade condition - the scraping blade is made of food-grade high 
density  polyethylene.    Eventually,  the  surface  that  touches  the 
freezing  tub  will  wear  down.    When  you  notice  a  change  in  the 
amount of product being left on the inside surfaces of the freezing 
tub, it will be time to change the blade.  You should be able to see 
the  gray/silver  of  the  tub  after  each  swipe  around  of  the  blade.  
There  will  always  be  a  film  of  product  on  the  surface  of  the  tub, 
but  if  you  can  longer  see  through  it  to  notice  the  color  of  the 
stainless  steel  beneath  it,  then  change  the  blade.    A  hex  key  is 
included with the machine that fits the 3 screws that secure the new 
blade  into  the  dasher  shaft.  Simply  remove  the  screws,  and  push 
the old blade out sideways.  When sliding the new blade in place, 
note that there is a top and bottom.  The bottom of the blade has a 
very  slight  taper  near  where  it  rides  along  the  bearing  disc  (see 
photo  5-1)    Be  sure  to  insert  it  the  correct  way  into  the  dasher 
shaft.  Line up the holes in the blade with the holes in the dasher  

Summary of Contents for CB-100

Page 1: ...OPERATING MANUAL BATCH FREEZER INSTALLATION OPERATING MAINTENANCE AND CLEANING MANUAL CB 100 Countertop World s Best Built Batch Freezers 100 Made in the U S A by the People Who Invented Them ...

Page 2: ... 100 NOMENCLATURE page 6 Section 3 OPERATION FIGURE 3 1 FIURE 3 1R FIGURE 3 2 FIGURE 3 3 FIGURE 3 4 FIGURE 3 5 FIGURE 3 6 page 7 Section 4 CLEANING AND SANITIZING page 12 Section 5 CARE and MAINTENANCE PHOTO 5 1 page 14 Section 6 PARTS DIAGRAMS FIGURE 6 1 FIGURE 6 2 FIGURE 6 3 FIGURE 6 4 FIGURE 6 5 page 16 Section 7 WARRANTY page 20 ...

Page 3: ...x from the skid by cutting through it as close as possible to the skid then lift it off Look for a small box inside which contains 4 black plastic feet and an Allen wrench to change out blades in the future The machine is held in place by two runners along its sides which have a clip at their middles that hooks into the middle bottom louver on each side of the machine The clips are screwed down to...

Page 4: ... 3 v 1 03 Figure 1 1 Figure 1 2 ...

Page 5: ... 4 v 1 03 Figure 1 3 Figure 1 4 ...

Page 6: ... 5 v 1 03 Figure 1 5 ...

Page 7: ...ure of the machine is that it freezes product in what will be your serving or hardening container Each additional container purchased comes with a bearing disc and a clear lid This machine will produce premium ice cream Italian ices sorbets and gelato in 20 minutes or less per tub Various inclusions can be added prior to churning and or after production in the same container it was just made in To...

Page 8: ...rd Be sure the round end of the shaft goes into the round hole in the bearing disc and push it all the way down until the bottom edge of the blade touches the surface of the disc See Figure 3 2 4 Pour the mix you intend to freeze into the tub NOTE do not add more than your flavorings and ONE quart of mix to the freeze tub You do not want overflow out of the top of the freeze tub 5 Lay the splash p...

Page 9: ... the desired consistency is reached turn the refrigeration timer to the zero 0 position and the compressor will stop Now turn the rocker switch off and the churning motor stops Raise the motor into its upright position Push down firmly on the ejection knob making the freezing tub rise up enough to grasp the rim and remove it from the machine Remove the splash disc and dasher from the freeze tub an...

Page 10: ... 9 v 1 03 Figure 3 1R Figure 3 2 ...

Page 11: ... 10 v 1 03 Figure 3 3 Figure 3 4 ...

Page 12: ... 11 v 1 03 Figure 3 5 Figure 3 6 ...

Page 13: ...e these parts should be either hand cleaned with detergent and warm water or run through a dishwasher The sanitizing is done just prior to use so the parts should be washed dried and stored in a clean place until ready to use the machine When assembling the 4 parts mentioned above for use have a gallon bucket of sanitizing solution ready as well as a roll of paper towels and a clean work surface P...

Page 14: ... paper towels Damp or wet sponges and rags harbor bacteria Wipe up spills and throw away wrappers paper towels or anything that may accumulate After production is complete any spilled product on the outer casing or top of the machine should be wiped up thoroughly and then wiped down with some of the sanitizer that was made earlier Look into the freezing cylinder If there is anything in it includin...

Page 15: ...ions 2 Blade condition the scraping blade is made of food grade high density polyethylene Eventually the surface that touches the freezing tub will wear down When you notice a change in the amount of product being left on the inside surfaces of the freezing tub it will be time to change the blade You should be able to see the gray silver of the tub after each swipe around of the blade There will a...

Page 16: ...rance but equal all around the hole If questionable replace the disc 4 Power cord be sure to keep the power cord routed in a safe path to your outlet If for some reason the cord becomes damaged or frayed or the plug does have an electrician replace the entire cord You can purchase this part from Emery Thompson 5 General cleanliness aside from the normal day to day cleanup of the machine and to kee...

Page 17: ... 16 v 1 03 Section 6 PARTS DIAGRAMS Figure 6 1 Figure 6 2 ...

Page 18: ... 17 v 1 03 Figure 6 3 ...

Page 19: ... 18 v 1 03 Additional Freezing Tub Kit Figure 6 4 ...

Page 20: ... 19 v 1 03 Figure 6 5 ...

Page 21: ... plant of the company located at 15350 Flight Path Drive Brooksville FL 34604 U S A Labor and Transportation Charges Emery Thompson Machine and Supply Company assumes no liability under the warranty for any transportation charges or labor expenses incident to its work under this warranty such transportation expenses and labor costs to be assumed and paid by the Purchaser Use and Care of Machine Pu...

Page 22: ...OLE REMEDY WITH RESPECT TO ANY EMERY THOMPSON FREEZER SHALL BE REPAIR OR REPLACEMENT OF DEFECTIVE COMPONENTS UNDER THE TERMS OF THIS WARRANTY WHAT IS NOT COVERED BY THIS WARRANTY Emery Thompson Machine s sole obligation under this warranty is limited to either repair or replacement of parts subject to the additional limitations below This warranty neither assumes nor authorizes any person to assum...

Page 23: ...OM ELECTRICAL POWER FAILURE THE USE OF EXTENSION CORDS LOW VOLTAGE OR VOLTAGE DROPS TO THE UNIT THERE ARE NO IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE NO DISTRIBUTOR DEALER OR OTHER PERSON IS AUTHORIZED TO MAKE ANY COMMITMENT OR ASSUME ANY LIABILITY ON BEHALF OF EMERY THOMPSON MACHINE AND SUPPLY COMPANY INC BEYOND THIS WARRANTY THERE ARE NO WARRANTIES WHICH EXTEND BEY...

Page 24: ...ard Artisan Gelato all old world water ice ITALIAN ICE sorbet sorbetto products and Dairy Free Ice cream In 2005 we sold our New York facilities to the New York Yankees Organization and built an all new manufacturing facility north of Tampa in Brooksville Florida The factory features state of the art manufacturing techniques and its own TV studio for photo shoots recording and web broadcasting Our...

Reviews: