Page 1: ...Danalyzer 370XA Gas Chromatograph Quick Start Guide ...

Page 2: ...m Pole mount brackets Atmospheric vent 4 inch Pole Natural gas pipeline Carrier gas Ultra High Purity 99 9995 Helium or optional Hydrogen Calibration gas inch stainless steel tubing Carrier gas switchover valves inch stainless steel tubing Heat traced insulated stainless steel tubing Sample probe installed at rd on center ...

Page 3: ...nit in a well ventilated area as required by government regulations WARNING Exit ports may discharge dangerous levels of toxic vapors use proper protection and a suitable exhaust device WARNING Observe and comply with all precautionary signs posted on the GC Failure to do so may result in injury or death to personnel or cause damage to the equipment NOTICE Install and operate all equipment as desi...

Page 4: ...o U bolts through the inserts and the holes in the bracket The base of the bracket should be 40 inches from the ground to make the operator interface easy to use 1000 mm 40 in 9 in 230 mm 11 in 280 mm 9 in 230 mm 11 in 280 mm Secure to the floor with four inch or inch cement anchors The cement foundation should be able to support the weight of the GC 45 lbs and its accessories as well as any other...

Page 5: ...allow the bolts to drop down and hold the GC loosely on the bracket 12 mm 5 in Mount the bracket on the wall Set the GC onto the bracket 1 Use a 6 mm hex wrench to screw the top two bolts into the back of the 370XA without the washers leaving inch 1 5 cm of thread showing 3 Screw in the two bottom bolts through the mounting bracket with the washers on The flat washer should be against the bracket ...

Page 6: ...he sample system installation kit 2 Use the two half inch bolts and a 5 32 hex wrench to screw the small mounting bar loosely to the right side of the plate with the angled foot facing the edge of the plate 3 Angle the plate onto the left side of the GC so that the large mounting block fits behind the left edge of the cut out Swing the right side of the plate around until it attaches to the right ...

Page 7: ... with the sample system connect the stream actuation and calibration gases from the sample plate to the manifold block as shown 3 Open the carrier gas bottle valves and set the regulator to 90 PSIG 6 2 BarG 4 Open the calibration gas bottle valves and set to 15 PSIG 1 BarG 5 Open the sample probe valves and set the sample pressure to 20 PSIG 1 4 BarG 6 Leak check all lines with liquid leak check s...

Page 8: ...the lower right cable entry If additional separation of wiring is required use the upper right cable entry for the additional signal wiring 4 Connect the signal wiring as shown in the diagrams below Lower left cable entry 24V DC Lower right cable entry Upper right cable entry Access to terminals Terminal Board Terminal Board Map Key TB8 TB8 TB5 TB4 TB9 TB10 TB2 TB3 TB1 TB9 TB4 TB2 TB3 TB1 TB4 TB5 ...

Page 9: ...letter H press the 4 key four times Turn on the power The local operator interface LOI will show the Emerson logo while the software starts up and then it will show the home screen FULL COLOR SCREEN 480 x 272 pixels UP EXIT CANCEL Alphanumerical Keypad OKAY ACCEPT DOWN RIGHT LEFT ENTER EDIT No Alarms Un Acknowledged Alarm s Active Alarm s Security Switch Unlocked Security Switch Locked View Hardwa...

Page 10: ...e arrow keys to navigate to the Application menu and select the TCP IP Settings option 2 Use the arrow keys to navigate through the various settings and press the Select Edit key to edit the appropriate values The settings must match the settings of the host device communicating to the 370XA on that port 3 When all the changes have been made press the Key to save changes and close the screen If re...

Page 11: ... to the Control menu and select Single Stream 2 Select the 4 Cal stream and check the Purge Stream for 60 seconds option 3 Let the GC run for at least 30 minutes Calibrate the GC 1 From the main menu navigate to the Control menu and select Halt to stop the current analysis 2 When the analysis cycle finishes select Calibration from the control menu 3 Select Purge Stream for 60 seconds and a Normal ...

Page 12: ...ROPE Emerson Process Management Bond Street Dumyat Business Park Tullibody FK10 2PB UK T 44 1259 727220 F 44 1259 727727 sales gcema emersonprocess com ASIA PACIFIC Emerson Process Management Asia Pacific Private Limited 1 Pandan Crescent Singapore 128461 Republic of Singapore T 65 6 777 8211 F 65 6 777 0947 analytical ap emersonprocess com MIDDLE EAST AND AFRICA Emerson Process Management Emerson...