Step 2 – Sample Handling System and Gas Line Connections
1
Mount the single stream sample plate
1. Use the two one-inch bolts and a 5/32 hex wrench to screw the
large mounting bar tightly to the left side of the plate with the
angled foot facing the edge of the plate.
NOTE:
To install a multi-stream sample system, please refer to the instructions provided in the sample system installation kit.
2. Use the two half-inch bolts and a 5/32 hex wrench to screw the
small mounting bar loosely to the right side of the plate with
the angled foot facing the edge of the plate.
3. Angle the plate onto the left side of the GC so that the large
mounting block fits behind the left edge of the cut-out. Swing
the right side of the plate around until it attaches to the right
side of the cut-out.
4. Slide the small mounting bar to the right so that it fits behind
the right edge of the cut-out. Tighten the small mounting
block's screws.