INSTALLATION
FIGURE 1-10. Attached plug (left) and attached dome connector (right)
Lock nut
Large o-ring
Port plug
Lock nut
Large o-ring
Dome connector
1.4 INSTALLING DOME CONNECTORS
AND PLUGS
Install dome connectors and plugs as shown in Figure
1-10.
1. Place the O-ring over the threaded end of the con-
nector or plug.
2. Screw the connector or plug into the opening until it
is snug. Then tighten an additional 1/2 turn. Do not
overtighten.
3. Place the lock nut concave side down on the
threads and using a screwdriver blade and mallet,
tighten the lock nut until there is approximately one
thread showing.
4. Thread cable through the dome connectors and
secure by tightening the nut to about 15 in-lbs of
torque. Confirm that cable does not slide or wiggle
after the nut has been tightened. Leave sufficient
cable inside the enclosure to make secure connec-
tions without placing stress on the cable.
Summary of Contents for Rosemount Analytical RDO
Page 2: ...2 this page left blank intentionally ...
Page 14: ...14 this page left blank intentionally ...
Page 16: ...16 this page left blank intentionally ...
Page 26: ...26 this page left blank intentionally ...
Page 30: ...30 this page left blank intentionally ...