HIGHLIGHTS OF CHANGES
Effective August 31, 2006 Rev 1.0
Page
Summary
General
Revised and removed the figures from Section 8, Drawings, and relocated them to their
applicable sections. Changed all references of the Micro-turn 200 to read as the Zero Jig.
Page 1-1
Added information under Component Checklist.
Page 1-1 thru 1-4
Added General information under System Overview.
Page1-2 thru 1-3
Added Figure 1-1, Typical System Package (Sheet 1 and 2).
Page 1-4
Added Figure 1-2, Transceiver Assembly with Weather Cover.
Page 1-8 thru 1-9
Updated Tables 1-1 and 1-2 to represent current conditions.
Page 2-1
Added the bulleted list under Overview.
Page 2-2
Added Clearance and Sample Area headings along with descriptive text.
Page 2-3
Added Figure 2-1, Installation Clearances and Weather Cover Dimensions.
Page 2-4
Added information and procedural steps under Regulatory Process Considerations, along
with Figure 2-2, Transmitter Location.
Page 2-5 thru 2-6
Organized information under Installation of Stack Flanges into procedural steps.
Converted important installation reminders from body text into the five Notes.
Page 2-7
Added Figure 2-3, Mounting the Stack Flanges.
Page 2-8
Added Figure 2-4, Stack Flange Installation.
Page 2-9
Updated Figure 2-5, Transceiver and Retro Reflector Hinge Pins to better illustrate the
hinge pin. Revised and streamlined information for Mounting the Air Plenum and Weather
Covers.
Page 2-10
Updated Figure 2-6, Air Plenum to better illustrate its assembly. Added Attach Blower
heading and step 1.
Page 2-11
Added Note regarding the installation procedures for the transceiver and retro reflector.
Page 2-12
Added Mounting the Control Unit procedural steps. Relocated Figure 2-8, Control Unit
from the end of the section.
Page 2-13 thru 2-14
Added Figure 2-9, Panel Cutout for Control Unit, and Figure 2-10 Control Unit Dimensions.
Page 2-15 thru 2-16
Added procedural steps under System Wiring Installation.
Page 2-17
Added Figure 2-11, Control Unit Terminal Identification.
Page 2-18 thru 2-19
Added Figure 2-12, Typical System Wiring (Sheets 1 and 2).
Page 2-20
Revised Figure 2-14, Service Module Switch Location. Updated procedural steps under
Beam Alignment Procedure. Revised Figure 2-15. Moved Air Flow Switch information to
Section 8, Troubleshooting.
Page 3-1
Added the Caution and information under Overview.
Summary of Contents for Rosemount Analytical OPM 4000
Page 2: ......
Page 6: ......
Page 10: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 TOC 4 ...
Page 14: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 iv ...
Page 42: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 2 20 ...
Page 52: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 4 6 ...
Page 58: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 5 6 ...
Page 64: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 6 6 ...
Page 100: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 A 24 ...
Page 102: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 B 2 ...
Page 104: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 C 2 ...
Page 114: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 OPM 4000 D 10 ...
Page 116: ...Instruction Manual IM 105 4000 Rev 1 3 October 2008 Index 2 OPM 4000 ...