Wiring and cable connections
The pickoff input signal connections are made at terminal strip connection TB2 for
Channel A, and TB3 for Channel B. Power supply and output signal connections are made
at terminal strip TB1. Refer to
,
,
and
.
Important
•
For single channel wiring use multi-conductor control and instrumentation cable (18AWG), or
equivalent.
•
Earth ground shield at one end only.
•
Insulate the shield at the other end.
•
For dual channel wiring use multi-conductor control and instrumentation cable (18AWG), or
equivalent.
•
Connect both shields to earth ground at one end of the cables and insulate the shields at the
other end.
•
The LME housing should be at earth ground.
2818 Dual channel preamplifier configuration
Table 2-7:
Plug component designator
Terminal connections Description
TB1 - Customer connection
1
+10 to 30 Vdc
2
Common
3
Common
4
Channel A output
5
Channel B output
6
TTL out A
7
TTL out B
TB2 - Channel A pickoff (1)
1
White
2
Red
TB3 - Channel B pickoff (1)
1
White
2
Red
2415 Intrinsically safe preamplifier configuration
Table 2-8:
Designator
Terminal connections
Description
Customer connection
1
Supply voltage
2
Common
3
Output signal (half frequency)
4
Output signal
Pickoff (1)
5
White
6
Red
Operating conditions and specifications
34
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Summary of Contents for daniel 1500 series
Page 8: ......
Page 12: ...Plan 2 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 64: ...Prepare the turbine meter for use 54 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 66: ...Install 56 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 72: ...Installation procedure 62 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 74: ...Testing 64 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 75: ...Part III Operate Operate User manual 65 ...
Page 76: ...Operate 66 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 80: ...Maintain 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 101: ...Decommission the turbine meter User manual 91 ...
Page 102: ...Decommission the turbine meter 92 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Page 103: ...Decommission the turbine meter User manual 93 ...