Section Title
Instruction Manual
February 2014
LIQ_MAN_6081-P
ii
Contents
Section 9: Calibration of Temperature
9.1
Introduction ......................................................................................................27
9.2
Calibration - Temperature .................................................................................27
Section 10: Calibration –pH and ORP
10.1
Introduction ......................................................................................................
29
10.2
Procedure – Auto Buffer Calibration .................................................................
30
10.3
Procedure – Manual Two-Point Buffer Calibration ..............................................
31
10.4
Procedure – Standardization ............................................................................
31
10.5
Procedure – Entering a Known Slope Value
.......................................................
32
10.6
ORP Calibration ................................................................................................
32
Section 11: Maintenance
11.1
Overview ...........................................................................................................
33
11.2
Transmitter Maintenance ...................................................................................
33
11.3
pH Sensor Maintenance ....................................................................................
33
11.4
ORP Sensor Maintenance ...................................................................................
34
11.5
Calibration ........................................................................................................
35
11.6
Power Module Replacement ..............................................................................
35
Section 12: Return of Material
Return of Material .............................................................................................
37
Contents (continued)
List of Figures
2-1
Wall Mounting Installation for 6081 ..................................................................................7
2-2
Pipe Mounting Installation for 6081 ................................................................................... 8
2-3
Removing Rear Cover ........................................................................................................
9
2-4
Power Module Warning Label ............................................................................................
9
2-5
Installing the Power Module ..............................................................................................
9
2-6
Securing the rear cover .................................................................................................... 10
3-1
6081 Sensor Wiring and Connection Points ..................................................................... 11
4-1
FM IS Installation .............................................................................................................
13
4-2
CSA IS Installation ............................................................................................................ 14
4-3
ATEX IS Installation
.......................................................................................................... 15
6-1
Displays During Normal Operation ..................................................................................
19
6-2
6081 Keypad
.................................................................................................................. 20
7-1
6081 Sensor Wiring and Connection Points .................................................................... 21
10-1
Calibration Slope and Offset ...........................................................................................
30
11-1
Checking the Potential of the Reference Electrode
..........................................................
34