10
Install rails into site rack
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
Note: The rails must be aligned carefully, and two people are required to install the components.
1. Insert the rail slide and seat both rail extensions into the rear channel of your rack. We
recommend placing the top rail pin into the hole just above a U marker.
2. Align the front of the ganged rail as shown. Insert retention screws in the front and
retention screws in the back of each rail. See the following illustration.
3. Do not fully tighten the retention screws at this time. Allow some adjustment space for the
installation of the components.
Install the retaining screws
After inserting the rail
extensions, install 2 screws
on each side of your rack
to hold the rails in place.
Install 3 retaining screws
on each side of your rack
to hold the ganged rails in place.
Front customer rack
Rail slides
1
DAE
2
25
23
22
20
4
27
26
17
14
11
8
12
BE 1
BE 0
SP
SPS
CS
Rear of rack
CNS-001376
Rail slides
1
2
25
23
22
20
4
27
26
17
14
11
8
12
Threaded
screw holes
DAE
BE 1
BE 0
SP
SPS
CS
Ganged rails
Summary of Contents for Celerra NS-480 System
Page 1: ...EMC Celerra NS 480 System Dual Blade Installation Guide P N 300 010 732 Rev A01 Version 6 0...
Page 37: ......
Page 38: ......