8
Remove ONLY
7 screws
per side.
Remove ONLY
7 screws
per side.
CNS-001384
Ganged rails
Blade enclosure
Standby power supply
Control Station
Storage processor
1
2
3
5
4
Front
Mini-rack
2
Control Station (CS)
4
Storage processor
enclosure (SPE)
3
Standby power
supply (SPS)
1
Disk-array
enclosure (DAE)
5
Blade enclosure
Remove this label and
paste it on the back of
the front cover of this
installation guide.
Disk-array
enclosure
Remove components from shipping container
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
2. Carefully set aside each component as
it is removed from the disposable
mini-rack shipping container.
Caution:
Two people are required to remove the components. Only remove screws holding
the components in place at this time. Do not remove the screws holding the rails in place; this
may cause damage to the components. Only remove one component at a time.
3. The ganged rails
remain in the mini-rack shipping
container at this time.
1. Using
a
Phillips-head
screwdriver, remove only 7 screws per side. Keep the removed screws
to install the components in your rack.
!
Summary of Contents for Celerra NS-480 System
Page 1: ...EMC Celerra NS 480 System Dual Blade Installation Guide P N 300 010 732 Rev A01 Version 6 0...
Page 37: ......
Page 38: ......