B
C
D
E
F
4. Operating instructions
Go to Index
•
In both operation and maintenance sections ,
follow the indications mentioned in section
1. Security warnings.
•
The equipment should be started once the
bromine level in the pool is between 1 and 3 ppm.
W
hen using
Emaux UV Nanotech Ozone
the
se
levels can be reduced between 0.25 to1ppm.
•
To open and load the equipment, follow the
instructions in section
5.Maintenance
.
•
Check that there are no leaks in the installation
before starting it up.
•
To adjust the dosage level, adjust the valve
(C)
located upon the equipment inlet
(E)
.
•
T
he adjustment of the dose varies according to
the conditions of use: water temperature, number
of bathers, solar radiation, among other factors.
A
Summary of Contents for CL-01A
Page 1: ...Chemical feeder CL 01A User Quick Guide...
Page 10: ......