background image

Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno 

 

 

Connecting inside (room) and outside (weather compensation) temperature sensors 

Inside temperature  sensor  is  connected to  boiler  by 2-strand  wire  using  terminal 

E

,  outside temperature 

sensor using terminal 

F

, wire is not included. 

LED display, signaling system and control  

 

 

Technical data table 

Boiler 

 power 

Manual power 

distribution (%) 

Power 

modulation 

Power supply 

230/400V 

Safety  

fuses (A) 

Power cord 

(mm²) 

Heated area A 

(m²)* 

Heated area B 

(m²)** 

4 kW 

100 – 67 – 33 

by 1/3 

1 phase 

1 x 20 

3 x 2,5 

~ 50 

~ 70 

4 kW 

100 – 67 – 33 

by 1/3 

3 phases 

3 x 6 

5 x 1,5 

~ 50 

~ 70 

6 kW 

100 – 67 – 33 

by 1/3 

1 phase 

1 x 32 

3 x 4,0 

~ 70 

~ 100 

6 kW 

100 – 67 – 33 

by 1/3 

3 phases 

3 x 10 

5 x 2,5 

~ 70 

~ 100 

9 kW 

100 – 67 – 33 

by 1/3 

1 phase 

1 x 40 

3 x 10,0 

~ 110 

~ 150 

9 kW 

100 – 67 – 33 

by 1/3 

3 phases 

3 x 16 

5 x 2,5 

~ 110 

~ 150 

12 kW 

100 – 67 – 33 

by 1/3 

1 phase 

1 x 63 

3 x 10,0 

~ 150 

~ 210 

12 kW 

100 – 67 – 33 

by 1/3 

3 phases 

3 x 20 

5 x 4,0 

~ 150 

~ 210 

15 kW 

100 – 67 – 33 

by 1/6 

1 phase 

1 x 80 

3 x 10,0 

~ 180 

~ 250 

15 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 25 

5 x 4,0 

~ 180 

~ 250 

18 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 32 

5 x 6,0 

~ 220 

~ 310 

21 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 40 

5 x 6,0 

~ 260 

~ 360 

24 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 40 

5 x 10,0 

~ 300 

~ 400 

27 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 50 

5 x 16,0 

~ 220 - 380 

 

30 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 50 

5 x 16,0 

~ 240 - 400 

 

33 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 50 

5 x 16,0 

~ 260 - 450 

 

36 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 63 

5 x 16,0 

~ 280 - 480 

 

39 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 80 

5 x 25,0 

~ 290 - 500 

 

42 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 80 

5 x 25,0 

~ 300 - 520 

 

45 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 80 

5 x 25,0 

~ 320 - 570 

 

48 kW 

100 – 67 – 33 

by 1/6 

3 phases 

3 x 80 

5 x 25,0 

~ 340 - 600 

 

            * A – Heated area A – boiler as main source of heat             ** B – Heated area B – boiler as alternative source of heat 

 

Exact cable cross section must be matched by qualified electrician based on local conditions analysis. 

1. LCD screen 
2. D.H.W. signal icon 
3. D.H.W. pump active icon 
4. D.H.W. program active icon 
5. C.H. signal icon 
6. C.H. pump active icon 
7. C.H. program active icon 
8. Current D.H.W. temperature 
9. Current C.H. temperature 
10. Time 
11. Date 
12. C.H. and D.H.W. temperature setting icon 
13. Weather compensation icon 
14. Room temperature icon  
15. Weekday 
16. Relays status 
17. Function buttons (symbols ←→↑↓) 
18. ON/OFF + return button 
19. Green diode – boiler turned on 
20. Red diode – boiler turned off 
21. Choose button 

Summary of Contents for goldline asbii

Page 1: ...less water heater for central heating systems Electric heating boiler GoldLine series RedLine series AsZN W Pułkownik Uranus Urano AsD W Generał Neptune Nettune AsDC W Marszałek Pluto Plutone AsBII Bateria Sun Sole AsHN Hetman Moon Luna AsBIV Dywizja Galaxy Galassia Please see video prior installation ...

Page 2: ...ELECTRIC HEATING BOILERS for more detailed pictures please see www elterm pl Dimensions and components of AsD W boiler Dimensions and components of AsZN W boiler Dimensions and components of AsBII boiler Dimensions and components of AsDC W boiler Dimensions and components of AsDC W boiler ...

Page 3: ...d for autonomous operation in both open and closed central heating systems safety unit expansion vessel and circulation pumps are included Boiler is build in on top of 100l hot utility water tank equipped with 29kW coil AsBII and AsBIV boilers in closed central heating system in closed type layout the central system needs to be equipped with an expansion vessel which is not supplied with above mod...

Page 4: ...therefore must be done by a qualified electrician only Boilers are designed for alternating current 3 phase power supply 400V 3N 50Hz Models with 4 6 9 12 and 15kW powers are also available without any processing in 1 phase version 230V 1N 50Hz greater powers can also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N or to switch ig...

Page 5: ...2 5 x 6 0 220 310 21 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 6 0 260 360 24 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 10 0 300 400 27 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 220 380 30 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 240 400 33 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 260 450 36 kW 100 67 33 by 1 6 3 phases 3 x 63 5 x 16 0 280 480 39 kW 100 67 33 by 1 6 3 phases 3 x 80 5 x 25 0...

Page 6: ...ally for AsD W and there is no possibility do turn heaters on Pre set venting time should be sufficient to carry out the process if however it is not enough whole procedure needs to be repeated by turning boiler off and on again The display switches to the home screen C C H and D H W for AsD W i AsDC W temperature setting enter function from home screen C by pressing using choose either C H or D H...

Page 7: ... will maintain 40 C etc Room temperature setting on boiler I enter function from home screen C by pressing using change preset room temperature in range 5 30 C Detailed settings multiple pressing of causes return to main menu Menu structure J K L 1 Settings 1 1 Power 1 2 Sections 1 3 Date time 1 4 PID P 1 5 Hysteresis CO 1 6 Hysteresis CWU 1 7 Default settings 1 8 Room programs 1 9 DHW programs 1 ...

Page 8: ...e 1 or 2 1 5 Settings CH Hysteresis press on home screen C and enter SETTINGS J then choose CH Hysteresis K and press once more Using T change parameter value range 1 2 3 4 5 6 which is then set by pressing 1 6 Settings DHW Hysteresis press on home screen C and enter SETTINGS J then choose DHW Hysteresis L and press once more Using U change parameter value range 1 2 3 4 5 6 which is then set by pr...

Page 9: ...m start 3 Program stop 4 Temp setting 20 70 C 5 Active yes no 6 Program number from 1 to 9 7 Function buttons 1 8 Settings ROOM programs press on home screen C and enter SETTINGS J then choose Room programs L and press once more Using Z switch between parameters weekdays working time temperature status using change parameter value which is then set by pressing 1 9 Settings DHW programs for AsD W a...

Page 10: ... to check proper pump pumps work Press on home screen C and enter VENTING J Press once more to display D H W C H options d Using change parameter value ON OFF e which is then set by pressing Do not remove boiler external metal casing once device remains turned on In case boiler is activated by mistake with no water inside wait until heaters cool down fill device with water and switch it on again U...

Page 11: ...requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circulators and glandless circulators integrated in products and that the standards hereinafter referred to have been duly applied and observed The harmonized standards applicable to the product to which this declaration of ...

Page 12: ...e or assembly that is not in compliance with the user manual etc or in the event the guarantee is invalid the costs of repair and travelling are borne by the claimant 6 Failure on the part of the user to follow the serviceperson s recommendations provided in the guarantee repair protocol results in the guarantee being suspended until such recommendations are implemented Do not call servicemen with...

Reviews: