6
Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno
PROGRAMMING
Basic settings
(multiple pressing of
causes return to main menu)
Boiler is on, in stand-by mode – red diode is visible (no 20 on display) –
recommended mode in summer
season.
For 5 seconds press
, what should cause green diode to light (no 19). Using ↑↓ please choose
available language (
A
)(Polish, English, German, French – depending on program version), confirm with ←.
Display now shows „Venting” and progress bar (
B
), which counts down 5 minutes needed for all essential
activities to vent boiler, pump and whole installation. This function cannot be skipped. In the meantime
C.H. pump is activated (additionally D.H.W. pump for
AsDC-W
, optionally for
AsD-W
), and there is no
possibility do turn heaters on. Pre-set venting time should be sufficient to carry out the process, if however
it is not enough – whole procedure needs to be repeated by turning boiler off and on again.
The display switches to the home screen (
C
).
C.H. and D.H.W.
(for
AsD-W
i
AsDC-W
)
temperature setting
– enter function from home screen (
C
) by
pressing ←, using ↑↓ choose either C.H. or D.H.W. (
D
). Press
to enter temperature setting (
E
)(
F
), then
using ↑↓ increase or decrease parameter value. The choice is set by pressing
.
Weather compensation curve
(
G
) – enter function from home screen (
C
) by pressing →, using ↑↓ choose
weather compensation curve from 0 to 10. Curves operate for outside temperatures lower than 15°C, with
Make sure the boiler is connected to electrical system in accordance with
hydraulic
and
electrical
assembly
section, all valves on radiators shall stay completely open.