background image

Elterm M.M.Kaszuba Sp.J., ul. Przemysłowa 5, 86-200 Chełmno 

 

 

HYDRAULIC ASSEMBLY 

 

All GoldLine and RedLine boilers are hanging (except 

AsDC-W

), vertical devices and 

after  taking  down  external  metal  cast,  should  be  hung  on  the  wall  using  attached 
mounting screws. 

Electric  heating  boiler  has  to  be  connected  to  the  central  heating  system  using 
couplings (¾”, 1” or 1¼” – depending on model) according to the direction of water 
flow  (see  glued  arrows  on  boiler).  Connection  to  be  made  in  accordance  with  PN-
91/B-02413  (open  systems),  PN-91/B-02414  (closed  systems)  or  applicable 
regulations  valid  in  the  country  of  installation.  Central  heating  system  has  to  be 
thoroughly  flushed  prior  installation.  Non-return  valves  (see  upper  picture  on  the 
right) are mandatory for proper 

AsD-W

 boiler operation (not supplied with boiler).

  

For 

AsDC-W

 (see bottom picture on the right) one-way valves for C.H.  and D.H.W. 

are factory assembled. Legend: 

1

 – C.H. feed, 

2

 – D.H.W. feed, 

3

 – circulation, 

4

 – 

cold water inflow, 

5

 – C.H. return.

 

ELECTRICAL ASSEMBLY 

Connection  to  the  electrical  system  needs  to  be  done  in  accordance  with  regulations  applicable  in  the 
country  where  the  given  boiler  is  installed  and  therefore  must  be  done  by  a  qualified  electrician  only. 
Boilers are designed for alternating current, 3-phase power supply (400V 3N~50Hz). Models with 4, 6, 9, 12 
and  15kW  powers  are  also  available  without  any  processing  in  1-phase  version  (230V  1N~50Hz),  greater 
powers  can  also  be  prepared  in  1-phase  version  upon  request.  Boiler’s  power  supply  is  connected  to 
terminal  strip  labeled  as  L

1

L

2

L

3

N  or  to  switch  ignition  (for 

AsBII

AsHN

  and 

AsBIV

).  PE  wire  needs  to  be 

connected  to  screw  on  mounting  plate.  Technical  data  table  (below)  provides  information  on  the  cross-
section  connecting  power  cord,  the  applicable  parameters  of  the  main  fuse  protecting  boiler,  as  well  as 
estimated heated areas for main and alternative heating source. Boiler should be connected to permanent 
electrical  system  via  device  enabling  boiler’s  disconnection  from  heating  source  at  all  ends,  with  the 
distance between contactors not less than 3mm. 

                                                       BASIC DATA 

Connection strip (sensors)

 

 

A

 – CH measurement (CH)

 

– connection to hydraulic balancer (BAL)

 

– CH measurement (CH) - option

 

D

 – D.H.W. measurement (HUW)

 

– inside/room temp. measurement (ROOM)

 

– outside temp. measurement/weather compensation (WEAT)

 

– outside thermostat/room temp. measurement 

 

– outside thermostat – D.H.W. temperature measurement 

 

   

Please familiarise yourself with the electrical and hydraulic diagram and technical 
data prior to assembly. 

Summary of Contents for goldline asbii

Page 1: ...less water heater for central heating systems Electric heating boiler GoldLine series RedLine series AsZN W Pułkownik Uranus Urano AsD W Generał Neptune Nettune AsDC W Marszałek Pluto Plutone AsBII Bateria Sun Sole AsHN Hetman Moon Luna AsBIV Dywizja Galaxy Galassia Please see video prior installation ...

Page 2: ...ELECTRIC HEATING BOILERS for more detailed pictures please see www elterm pl Dimensions and components of AsD W boiler Dimensions and components of AsZN W boiler Dimensions and components of AsBII boiler Dimensions and components of AsDC W boiler Dimensions and components of AsDC W boiler ...

Page 3: ...d for autonomous operation in both open and closed central heating systems safety unit expansion vessel and circulation pumps are included Boiler is build in on top of 100l hot utility water tank equipped with 29kW coil AsBII and AsBIV boilers in closed central heating system in closed type layout the central system needs to be equipped with an expansion vessel which is not supplied with above mod...

Page 4: ...therefore must be done by a qualified electrician only Boilers are designed for alternating current 3 phase power supply 400V 3N 50Hz Models with 4 6 9 12 and 15kW powers are also available without any processing in 1 phase version 230V 1N 50Hz greater powers can also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N or to switch ig...

Page 5: ...2 5 x 6 0 220 310 21 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 6 0 260 360 24 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 10 0 300 400 27 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 220 380 30 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 240 400 33 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 260 450 36 kW 100 67 33 by 1 6 3 phases 3 x 63 5 x 16 0 280 480 39 kW 100 67 33 by 1 6 3 phases 3 x 80 5 x 25 0...

Page 6: ...ally for AsD W and there is no possibility do turn heaters on Pre set venting time should be sufficient to carry out the process if however it is not enough whole procedure needs to be repeated by turning boiler off and on again The display switches to the home screen C C H and D H W for AsD W i AsDC W temperature setting enter function from home screen C by pressing using choose either C H or D H...

Page 7: ... will maintain 40 C etc Room temperature setting on boiler I enter function from home screen C by pressing using change preset room temperature in range 5 30 C Detailed settings multiple pressing of causes return to main menu Menu structure J K L 1 Settings 1 1 Power 1 2 Sections 1 3 Date time 1 4 PID P 1 5 Hysteresis CO 1 6 Hysteresis CWU 1 7 Default settings 1 8 Room programs 1 9 DHW programs 1 ...

Page 8: ...e 1 or 2 1 5 Settings CH Hysteresis press on home screen C and enter SETTINGS J then choose CH Hysteresis K and press once more Using T change parameter value range 1 2 3 4 5 6 which is then set by pressing 1 6 Settings DHW Hysteresis press on home screen C and enter SETTINGS J then choose DHW Hysteresis L and press once more Using U change parameter value range 1 2 3 4 5 6 which is then set by pr...

Page 9: ...m start 3 Program stop 4 Temp setting 20 70 C 5 Active yes no 6 Program number from 1 to 9 7 Function buttons 1 8 Settings ROOM programs press on home screen C and enter SETTINGS J then choose Room programs L and press once more Using Z switch between parameters weekdays working time temperature status using change parameter value which is then set by pressing 1 9 Settings DHW programs for AsD W a...

Page 10: ... to check proper pump pumps work Press on home screen C and enter VENTING J Press once more to display D H W C H options d Using change parameter value ON OFF e which is then set by pressing Do not remove boiler external metal casing once device remains turned on In case boiler is activated by mistake with no water inside wait until heaters cool down fill device with water and switch it on again U...

Page 11: ...requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circulators and glandless circulators integrated in products and that the standards hereinafter referred to have been duly applied and observed The harmonized standards applicable to the product to which this declaration of ...

Page 12: ...e or assembly that is not in compliance with the user manual etc or in the event the guarantee is invalid the costs of repair and travelling are borne by the claimant 6 Failure on the part of the user to follow the serviceperson s recommendations provided in the guarantee repair protocol results in the guarantee being suspended until such recommendations are implemented Do not call servicemen with...

Reviews: