Minipack, PS System
356808.103
Quick Start Guide
Installation, Operation, Commissioning and Maintenance
DC Power Supply System
Integrated Applications
Introduction
o
The
Smartpack
based Product Range (2 )
o
Brief System Description
⎯
Minipack
(2 )
Commissioning
o
Pre-start check (10 )
o
Commissioning steps, Startup (10-11)
Operation
o
Front keys and display (12)
o
Software Menus (12)
Appendix
Communication
o
Installing
PowerSuite
– PC software (13)
o
CAN Bus Termination and Addressing (14)
AC Mains
o
External AC Fuses ~ Recommended Rating (15)
o
Mains Feeds versus Rectifier ID (16)
Battery Monitoring
o
48V Battery Symmetry Connections ~ Controller (17 )
o
48V Battery Symmetry Connections ~ Battery Monitor (18-19)
o
Battery Interface Card ~ Terminals & Pin-out, ( 20)
Alarms & Monitoring
o
Standard Alarm Relays & Digital Inputs (21)
o
Alarm Interface Card ~ Terminals & Pin-out (21)
o
Alarm Interface Card, Extended ~ Terminals & Pin-out (22)
o
Alarm Interface Card, External ~ Terminals & Pin-out (22)
Internal Connections
o
System Interface Card ~ Terminals & Pin-out (23)
o
LVD Latching Contactors (23)
CAN Bus Nodes
o
Battery Monitor CAN Node ( 24)
o
Load Monitor CAN Node ( 25)
o
I/O Monitor CAN Node ( 26)
Drawings
o
Schematic Diagram
Minipack
48VDC, 3.2kW (29)
o
Schematic Diagram
Minipack
48VDC, 4.8kW (30)
Check Lists
pullout forms
o
Installation Check List
o
Circuit Distribution List
o
Commissioning Procedure
o
Maintenance Procedure
Installation
o
Installing
Smartpack
and Rectifier Modules ( 3)
o
Installation and Maintenance Details
⎯
Opening or Closing the
Minipack
Drawer Shelf (4)
⎯
Mounting or Removing
Minipack
Blind Covers (4)
⎯
Removing or Mounting Load MCBs (5)
⎯
Configuring Priority and Non-Priority Load Circuits (5)
o
Installation steps; mechanical, electrical (6-7)
o
Location of Components, GA drawing; 6 and 4 rectifiers systems (8)
o
Connections, Factory Settings, etc. (9)