54
Assembly
, Connection and Putting into Operation
5.3.2.2 Internal view
Ill.: 14
1 Sealing point to secure the calibration switch.
2 Sealing points to secure the circuit board cover.
3 Sealing points to secure the terminal covers of the inputs and
outputs used.
These sealing points Ill.:
14
/3 to secure the pulse inputs
and pulse outputs are subject to national regulations
(cf. WELMEC 11.1, chapter 2.7.1).
Depending on the legal situation in the respective country
of use, seals produced by legally authorized
manufacturers or the meter operators, should be used.
5.3.3 Closing the housing
CAUTION!
Damage to property caused by improper device
closure!
If the device is not properly closed cables can get
pinched and cause damage.
Therefore:
– Please ensure that the cable ducts are positioned
correctly when closing the device.
1
2
3
Summary of Contents for DL230
Page 1: ...Operating manual Data Logger DL230 ...
Page 8: ......
Page 105: ...Appendix 105 English manual 73 022 387 ...
Page 106: ...106 Appendix 9 2 EC Declaration of Conformity ...
Page 107: ...Appendix 107 9 3 ATEX Type Examination Certificate 9 3 1 Associated apparatus for Zone 0 1 ...
Page 108: ...108 Appendix ...
Page 109: ...Appendix 109 ...
Page 110: ...110 Appendix ...