16
DSWH160UVPC
Installation and Maintenance Manual
9. Open the CO
2
valve.
1. Using a screwdriver slowly turn valve screw counterclockwise (left)
to open valve.
2. Continue until pressure reads 50 to 58 psi max.
10. Re-purge the line for sparkling water.
NOTICE:
The water will flow flat at first, then gradually
become more sparkling as the line is purged of still water.
NOTICE:
If the "No/low CO
2
" error LED flashes during this step, there is a problem with the connection
to the CO
2
source. Check all components in the gas system before proceeding.
11. Allow machine to complete initial chilldown.
NOTICE:
Complete chilling of ice bank will require around 30 minutes - 1 hour. The machine should not
be used as a water dispenser until chilling is complete.
NOTICE:
Complete water heating will require around 10 minutes. The machine should not be used as a
water dispenser until heating is complete.