30
OPTIONAL EXTRA
FINIAL AND CRESTINGS DETAIL
Place the finial onto the upper flange, level with the end ridge. The slot in the lower part of the fini-
al sits on top of the upper flange. Do likewise with the ridge cresting.
The other end of the ridge has the 2
nd
finial fitted in a similar manner to the 1
st
if this 2
nd
finial over-
hangs the ridge by up to 25mm (1”) you can move the 1
st
finial and crestings so there is an equal
overhang of 12.5mm (1/2”). Insert the small self-tapping screw into the pre-drilled holes of the two
end finials and tighten until the screw butts up to the upper flange of the ridge, locking the finial in
place.
If the overhang of the 2
nd
finial is greater than 25mm (1”) you can easily trim the end down with a
hacksaw to make a flush finish at the end of the ridge.
Summary of Contents for STREAMLINE Series
Page 1: ......
Page 2: ...2...
Page 3: ...3...
Page 14: ...14...
Page 17: ...17 DOOR FRAME ASSEMBLY...
Page 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...
Page 31: ...31 OPTIONAL EXTRA RAINWATER KITS...
Page 32: ...32 ELITE 1803...