6
INSTALLATION INSTRUCTIONS FOR THE 5’3” WIDE MODEL
“STREAMLINE RANGE”
The contents of this carton are divided into the different frame assemblies that collectively
make up the completed greenhouse framework.
It is recommended that each framework assembly is fully completed before moving onto the next.
The contents are as follows:
1.
Two side frames
2.
Rear end frame
3.
Door end frame
4.
Roof vent
5.
Doors
6.
Bag of fittings containing:
Nuts and bolts general assembly
Overlap clips for glass
Spring clips for glass
Casement stay
Casement stay nuts and bolts
Four eave plates (not in the main bag, but taped up with the casement stay)
Two ridge plates
Four door wheels
Four door guides
Small self tapping screws
Double door catch
Two connecting plates
Two flat bar small door track supports
7.
Roof bars
8.
Coil(s) of glazing beading
9.
One length of ridge
10.
Two black brush draught excluders
For clear identification of parts and the number required please carefully refer to he earli-
er pages of component drawings and parts list.
Summary of Contents for STREAMLINE Series
Page 1: ......
Page 2: ...2...
Page 3: ...3...
Page 14: ...14...
Page 17: ...17 DOOR FRAME ASSEMBLY...
Page 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...
Page 31: ...31 OPTIONAL EXTRA RAINWATER KITS...
Page 32: ...32 ELITE 1803...