From the main bag of fittings you will require the nuts and bolts, two eave plates and one ridge
plate. These are packed with the casement stay and are separated from the main bag of fittings.
Components:
1 alloy built in base
2 glazing bars
2 rear end diagonal bracing angles
1 horizontal brace
2 roof corner bars (marked “R” at the apex)
2 side corner bars (unmarked)
Corner bars are in two packs of 4 and are identical for both gables. They are marked “corner bars”.
INSTRUCTIONS
1.
Lay out the frame as though you were standing on the inside i.e. with the bolt slot uppermost,
roof corners marked “R” at the apex, opposite each other, facing downwards (i.e. “R” on out-
side). The roof corner bars are mitred at both ends where as side corner bars are mitred at one
end only
(Key Point).
The bolt slot is on the inside and faces inwards during initial
construction. If you have a painted greenhouse there is no letter “R” on the corner bar. You
must
ensure that the “middle” hole is nearer to the ridge plate than the eave plates.
(Key
Point).
2.
Slide the glazing beading into each glazing bar and corner bar taking care not to stretch the
material. Trim off any surplus level with the ends of the glazing bar. The corner bars have 3
grooves to receive beading.
Do not
use the middle one, only the two outer grooves require
glazing beading.
3.
Slide two bolts into the bolt channel of each corner bar, put a nut on and finger tip tighten
approx 3” from the end of the bar. These will later be used in the general assembly for fixing
the ridge, eave and built-in-base to the ends. Now secure the ridge plate and eaves plates by
inserting bolts through the ‘plates’ and into the holes punched in the flange of the corner bar,
at the apex and eave. Do not tighten the nuts and bolts in the plates at this stage, finger tip
tighten is sufficient.
4.
Attach the built in base to the side corner bars by inserting a bolt through the hole in the
flange of the corner bar and into the slot at the built in base (approx. 20mm from then end).
5.
Attach the vertical glazing bars to the built in base by inserting a bolt into the bolt channel of
the glazing bars and locating it with the punched holes in the built in base. Before securing the
nuts attach the rear end diagonal brace to the same bolt as illustrated. The top of the rear end
diagonal brace now attaches to the pre-fabricated holes approx. 8” from the top of the side
corner bar.
6.
Slide two bolts into the bolt channel at the top of the two vertical glazing bars and secure the
second one to the roof corner bars by inserting the bolt through the punched hole in the
flange.
Summary of Contents for STREAMLINE Series
Page 1: ......
Page 2: ...2...
Page 3: ...3...
Page 14: ...14...
Page 17: ...17 DOOR FRAME ASSEMBLY...
Page 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...
Page 31: ...31 OPTIONAL EXTRA RAINWATER KITS...
Page 32: ...32 ELITE 1803...