background image

PARTS LIST 

 

 

 

 

 

  

  

4 x 5

 

6 x 5

 

8 x 5

 

10 x 5

 

1

 

Nuts and bolts M6 

  

90 

100 

110 

124 

2

 

Band clips 

  

164 

204 

244 

284 

3

 

Wire clips 

  

10 

10 

10 

14 

4

 

Overlap clips 

  

26 

32 

38 

44 

5

 

Casement stay 

  

6

 

Stay pins 

  

7

 

Pins, nuts and bolts M4 

  

8

 

Double door lock 

  

9

 

Self tapping screw 

  

28 

28 

28 

28 

11

  Glazing beading (m) 

  

49 

58 

68 

77 

12

  Door guides 

  

13

 

Eave plates

 

Taped together with

 

14

 

Ridge plates

 

one casement stay

 

15

  Door wheels and fittings 

  

16

  Ridge 

  

17

  Combined eaves bar and gutter 

  

18

  Built in base side 

  

19

  Side diagonal braces 

  

20

  Door end built in base 

  

21

  Door end cill  

  

22 

Rectangular connecting plates  

 

23

  Top door track 

  

24

 

Top door panel

 

With name plate taped

 

25

 

Bottom door panel

 

together and marked

 

26

 

Middle door panel

 

"door"

 

27

  Door track support 

  

28

  Door posts (2 handed, 2 unhanded)    

29

  Side glazing bar 

  

30

  Roof glazing bar 

  

31

  Vent (in packs) 

  

32

 

Door end glazing bars

 

Taped together and

 

33

 

Door end horizontal angle

 

marked "Door end"

 

34

  Door end diagonal brace 

  

35

  Door track support flat bar 

  

36

  Rear end built in base 

  

37

 

Rear end glazing bars

 

Taped together and

 

38

 

Rear end horizontal angle

 

marked "Rear end"

 

39

  Rear end diagonal braces 

  

40

  Corner bars in two packs 

  

41 

Corner Brackets 400mm long 

 

42

  Glass made up of; 

See glazing key at back of 
booklet 

  

  

  

  

43

  Full sheet toughened glass 

See glazing key at back of 
booklet 

  

  

  

  

Summary of Contents for STREAMLINE Series

Page 1: ......

Page 2: ...2...

Page 3: ...3...

Page 4: ...plates 2 2 2 2 23 Top door track 1 1 1 1 24 Top door panel With name plate taped 2 2 2 2 25 Bottom door panel together and marked 2 2 2 2 26 Middle door panel door 6 6 6 6 27 Door track support 1 1 1...

Page 5: ...nhouse in vulnerable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gl...

Page 6: ...fittings containing Nuts and bolts general assembly Overlap clips for glass Spring clips for glass Casement stay Casement stay nuts and bolts Four eave plates not in the main bag but taped up with the...

Page 7: ...e holes in the eaves bar and securing with a nut You do not need to tighten the nuts too much at this stage but they need to be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the...

Page 8: ...uired number of bolts into the glazing bars Lay out the component parts on the ground as though you were standing on the inside of a completed green house i e with the bolt slots uppermost Glazing Bar...

Page 9: ...n the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the cor ner bar You must ensure that the middle hole...

Page 10: ...er bars have 3 grooves to receive beading Do not use the middle one only the two outer grooves require glazing beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finge...

Page 11: ...nto the built in base cill This will be used later to attach the bolt down brack ets 11 Slide a bolt into the bolt slot in the built in base section one at each end Attach the corner bracket angle app...

Page 12: ...he end of the two built in base pieces 3 Slide 2 bolts into the bottom of each glazing bar and 3 bolts only 1 if greenhouse to be sited on soft ground into the free end of each built in base section A...

Page 13: ...wnwards If you are fitting your greenhouse onto soft ground then do not fit the corner bracket yet If you are on a patio you will need to cut the bracket off level with the bottom of the built in base...

Page 14: ...14...

Page 15: ...nhanded door post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of each bar i e...

Page 16: ...panel See picture below 8 Slip the nylon door skids on each of the bottom panels This may already have been done pri or to delivery After fitting the doors see later in the booklet you may need to lo...

Page 17: ...17 DOOR FRAME ASSEMBLY...

Page 18: ...les are fitted to the infill panel on each door choose between 1st or 2nd panel down Posi tion the handle centrally and mark the hole position Drill 7mm diameter holes 2 holes per door then fit the ha...

Page 19: ...st The vent top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the beading groove in the vent side and vent to...

Page 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...

Page 21: ...olt and tighten up Key Point 5 The built in base attaches to the inside of the corner bar The bolt placed in the corner bar bolt slot at gable end assembly will slide down into the slotted hole at the...

Page 22: ...osition thus preventing sideways movement of the vent N B There is no hole for the screw but it will easily push into the tube and screw up Key Point You only require one tube per vent on the left han...

Page 23: ...ll glass retaining lip just above the combined eaves bar and gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out of square the corner diagonally...

Page 24: ...ides of the door opening and at tach the flat bars using the end with the larger hole leave finger tip tight Let the flat bar hang down then slide them left right until the smaller hole at the bottom...

Page 25: ...vent the door from sliding past its opening you must fix 2 angle brackets to the door end assembly Insert a cropped head bolt into the bolt channel at the top of the left hand glaz ing bar viewed from...

Page 26: ...nels will require a larger overlap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key Point 4 Offer the next pane of glass to the glazing bars resting it on the two clips of...

Page 27: ...vre replaces one A The louvre must be sandwiched between the 610 x 140 and the A pane and must go on the rear gable horticultural glass application only Ref Width Length A 610 610 B 610 457 C 610 410...

Page 28: ...r the position of the different sizes 5 The glass is clipped onto the frame in the same way as the horticultural glass is but use 8 clips per large pane You do not use stainless steel clips if you hav...

Page 29: ...ref 13 with 610mm x274mm the louvre and 1 ref 18 The louvre must be sandwiched between the two panes of glass It must not sit directly onto the aluminium base cill Ref Width mm Length mm 12 457 1197 1...

Page 30: ...r to the 1st if this 2nd finial over hangs the ridge by up to 25mm 1 you can move the 1st finial and crestings so there is an equal overhang of 12 5mm 1 2 Insert the small self tapping screw into the...

Page 31: ...31 OPTIONAL EXTRA RAINWATER KITS...

Page 32: ...32 ELITE 1803...

Reviews: