8
11) Assembling the chin-rest paper (L)
Fig.16
Pull out the two fixing pins from the
chin-rest.
Get rid of the paper package and let
the pins go through its holes.
Insert the fixing pins into the hole
again (Fig.17).
12) Placing spare parts
Some spare parts could be stored in
the accessory drawer (6) (Fig.18).
Fig.17
Fig.18
2.3
Checking procedure after assembling-------------------------------------
1) Power plug
This instrument supplies a 3-wire cable.
Please select a proper power socket as
matched.
Ensure that the instrument is grounded well.
Attention: Please use the special
cable
supplied
with
this
instrument.
2) The power box and the illumination part
When the main power switch (8) of
the power box is placed at ‘I’, it turns
on, and ‘O’ for turn off. The main
power switch should be set at the ‘O’
position before connecting the input
cable with the power socket.
Turn on the main power switch,
and the pilot lamp (9) will be
lighted. Open the slit width
control knob (35) to examine the
illumination.
Rotate the brightness control
switch (7) respectively at three
positions and the brightness
should be changed accordingly.
Check the fixation target device
to confirm it is lighted.
Check
whether
all
those
moveable parts such as aperture
and slit height control knob (29),
filter selection lever (28), and
magnification changer lever (18)
etc. could be operated freely.
After examining, turn off the
main power and cover the
instrument with the dust-proof
cover (O).