PURELAB Ultra Mk2
Operator Manual
ELGA
Page 36
PURELAB Ultra Mk 2 Version 3 11/08
Step 7 - Fit New UF
1. REFIT top and bottom connectors to new UF ensuring
the ‘O’ rings are correctly located.
2. RECONNECT quick connect coupling.
CAUTION!
Ensure tubes are fitted to correct ports.
3. CLIP the new UF into spring clips.
4. REFIT the UV housing on securing screws.
5. TIGHTEN securing screws.
Step 8 - Replace the UV
1. SEE Section 7.4 (Step 5).
Step 9 - Rinse New UF
CAUTION!
The new Ultra Filter must be rinsed. To
rinse the unit enter the Sanitizing
Procedure, (see Section 8). Ensure the by-
pass blocks are correctly fitted and that
NO tablets have been inserted.
1. SWITCH ON power. The unit will enter sanitization
mode.
2. PRESS FLUSH button.
Note: This rinse must be completed and until
complete will inhibit the PROCESS function.
3. CHECK for leakage from the UF.
4. RETIGHTEN
if
necessary.
5. Ignore the step to reset the sanitization date, PRESS
TICK
9
button.
Step 10 - Set UF Change Reminder
1.
SEE Section 5.5 - Setting Up Password/ Replacement
Timers.
Summary of Contents for PURELAB Ultra Mk 2 Scientific
Page 4: ......