PURELAB Prima 7/15/30
Operator Manual
ELGA
Page 14
PURELAB Prima 7/15/30 Version 01 09/08
Step 2 - Connect Electrical Supply
1. PLUG mains lead into the socket on the left hand
side of the
PURELAB Prima
unit.
2. PLUG mains lead into mains socket.
Step 3 - Connect High/Low Level Switch to Reservoir
1. INSERT jack plugs into the level control socket
located at rear of unit and reservoir.
Mains power socket
Fuse
ON/OFF
switch
Mains power lead
Electrical Connections
Level control
Reservoir Level Connections
Summary of Contents for PURELAB Prima 15
Page 1: ...PURELAB Prima 7 15 30 Operator Manual ...
Page 2: ......