Resistance Welder MULTISPOT MI-100
Installation
23
5 Installation
5.1 Before
installation
5.1.1 Preliminary
works
Check operating conditions according to specifications.
(
See “9”.)
If necessary, allow equipment time to adapt to ambient temperature SLOWLY.
Make sure that operating company’s supply systems comply with specifications.
(
See “9”.)
Before you start any works, make sure the work area is tidy, clean and free of clutter and offers
enough room to move.
Make sure your tools are complete and in good working order.
Do wear safety shoes.
5.2 Filling up cooling water tank
~
33 l
Fig.18: Filling opening
1.
Twist off cap.
2.
Fill about 33 litres / 9 gallons of cold, clean drinking water into the tank.
3.
Add chlorine-free disinfectant to prevent growth of algae and bacteria.
4.
Replace cap properly. Check for tightness.
5.
Before you switch on the welder, be sure to check the level gauge beneath the filling hole.
6.
Fill up, when necessary. Make sure the level is always visible in the level gauge.
NOTE!
For draining the tank,
see”8.2.4