33
5.
Verify that the brine 3-way valve is in the
normal
operations position with its handle is pointing to the
open pathway.
6.
Verify that the Pressure Regulating valve is completely open by turning the valve until it stops
counterclockwise
.
C
AUTION
:
Y
OU NEVER WANT TO START THE HIGH PRESSURE PUMP WITHOUT THE PRESSURE
REGULATING VALVE BEING IN THE FULLY OPEN POSITION
,
TURNED TO THE STOP IN THE
FULL COUNTERCLOCKWISE
.
7.
Turn on the Boost Pump and monitor the system until the boost pump has re-primed the system and water
is flowing
out
of the brine discharge.
8.
Turn
on
the high pressure pump for approximately 30-40 seconds to allow the chemical reagent to
dissolve and be pulled into the RO pressure vessels.
9.
Turn
off
the high pressure pump
10.
Turn
off
the boost pump
11.
Turn the Inlet Water Selector 3-way valve to the middle
off
position and allow the membrane to sit in the
cleaning solution for a time ranging from
2 hours to overnight
.
After the cleaning solution has been allowed to remain in contact with the membrane for the desired length
of time, the standard “
Freshwater Flush Procedure
” is used to rinse out the cleaning chemical. The
procedure is outlined below.
CAUTION:
B
E SURE THAT THE
P
RODUCT
W
ATER
S
ELECTOR
3-
WAY VALVE IS IN THE
“
WATER SAMPLE
”
POSITION
.
Y
OU DO NOT WANT THE CLEANING CHEMICALS TO ENTER
YOUR SHIPS FRESH WATER TANKS
!
12.
Remove the spent cleaning cartridge from the 5 micron pre-filter housing and
replace
it with a new 5
micron filter element or if necessary, proceed to inserting an organics cleaning cartridge
13.
Verify that the Product Water Selector 3-way valve is in the “
Water sample
” position.
14.
Turn the Inlet Water Selector 3-way valve from the middle “
Off
” position to the freshwater flush position
(you will be pulling water from your ships freshwater tanks, so be sure there is adequate fresh water in the
tank for the freshwater flush or you run the risk of running the system dry).
15.
Verify that the Pressure Regulating valve is completely open by turning the valve until it stops
counterclockwise
. (you never want to start the high pressure pump without the pressure regulating valve
being in the fully open position, turned to the stop counterclockwise)
16.
Turn
on
the boost pump and let it run for
at least
1 minute (verify freshwater flow by seeing water exiting
the brine discharge).
17.
After confirming water flow exiting the brine, turn
on
the high pressure pump for 5 minutes.
CAUTION:
D
O NOT RUN FRESH WATER THROUGH THE
RO
PRESSURE VESSEL AT
PRESSURE
;
ALWAYS MAKE SURE THE
P
RESSURE
R
EGULATING VALVE IS COMPLETELY OPEN
(
TURN COUNTERCLOCKWISE UNTIL THE VALVE STOPS
).
R
UNNING FRESH WATER THROUGH
THE
RO
MEMBRANES WILL RUPTURE THE MEMBRANE AND DESTROY THEM
.
The exact procedure as outlined above can now be performed again using the organics cleaning cartridge.
Summary of Contents for AQUAMAAX MODULAR SERIES
Page 13: ...13 Figure 5 Process Flow Diagram ...
Page 18: ...18 Control Panel Figure 8 Control Panel Front View ...
Page 19: ...19 Control Panel Backside Figure 9 Control Panel Back View ...
Page 21: ...21 Pre filter Assembly Figure10 Pre filter Assembly20 micron 5Micron ...
Page 24: ...24 Figure 13 115 VAC Motor Wiring Installation Diagram ...
Page 25: ...25 Figure 14 DC Motor Boost Pump Wiring Installation Diagram ...
Page 26: ...26 Figure 15 DC Motor Electrical System Schematic ...
Page 27: ...27 Figure 16 Engine Driven Electrical System Schematic ...
Page 37: ...37 Auto Flush Wiring Connections ...
Page 38: ...38 Notes for your convenience ...