52
Heating
4. On the right side of the heat box unscrew
the 2 screws which are located at the bottom
of the heat box. Loosen the 2 screws above,
fig. 1.
5. Pull out the gas burner and replace it.
6. Assemble in the opposite order as described
above.
Replacing the Gas valve
Before starting follow the steps on the previous page,
chapter "Before replacement".
1. Dismount the electrode wire on the left side of
the heat box, see previous page.
2. Loosen the compression nut, fig. 2.
3. Dismount the earth conductors on the valve,
fig. 3.
4. Unscrew the control box lid and pull out
the box, fig. 3.
5. Unscrew the 2 screws and pull out the gas
valve and mount the new valve.
6. Assemble in the opposite order as described
above.
Control box
Earth conductors
1
2
4
3