Data di emissione:
Febbraio, 2019
Revisione:
6
Pag. :
19/28
Control and replacement of seals
BOWL GASKET (LOCATED AT THE REAR OF
BOWL)
Replace it every 12 months according to the
conditions of use and level of maintenance.
DISPENSE VALVE O-RING
The dispense valve o-rings should be replaced
as necessary when wear is evident. Lubricate
them each time they are replaced or the
dispense valve is removed for cleaning.
SUCTION GASKET
Replace every 3 months according to the
conditions of use and level of maintenance. This
part should be lubricated during the re-
assembly after every cleaning with Vaseline.
EVAPORATOR HARD SEAL
Replace every 9 to12 months according to the
conditions of use and level of maintenance.
Winter storage
To protect the unit during seasonal shutdown,
it’s important to properly store the machine
using the following procedures:
- Disconnect all power to the freezer.
- Disassemble, wash and sanitize all parts that
come into contact with the mix as described in
chapter 10.
- Clean also all the exterior panels.
- Reassemble all these parts.
- Cover the machine with the original package
to protect it from dust or other contaminating
elements.
- Place the machine in dry location.
Summary of Contents for GT1 Push
Page 1: ...Data di emissione Febbraio 2019 Revisione 6 Pag 1 28 GT1 e GT2 Push Operator s manual ...
Page 22: ...Data di emissione Febbraio 2019 Revisione 6 Pag 22 28 14 WIRING DIAGRAM ...
Page 23: ...Data di emissione Febbraio 2019 Revisione 6 Pag 23 28 ...
Page 24: ...Data di emissione Febbraio 2019 Revisione 6 Pag 24 28 ...
Page 25: ...Data di emissione Febbraio 2019 Revisione 6 Pag 25 28 ...
Page 26: ...Data di emissione Febbraio 2019 Revisione 6 Pag 26 28 ...
Page 27: ...Data di emissione Febbraio 2019 Revisione 6 Pag 27 28 ...