Data di emissione:
Febbraio, 2019
Revisione:
6
Pag. :
17/28
9. OPERATING INSTRUCTIONS
Activating the main switch A on the right side of
the machine and, in case of double bowls
machine, also the small ones B and C, the
augers will start rotating and mixing (fig.26).
!NOTE!
GT is equipped with a very efficient safety
mechanism, if the main cover is not correctly
positioned, GT will not work.
!WARNING!
Every time the unit is shut down with the main
switch, it is necessary to wait two minutes
before starting it up again; failure to do so could
damage the unit.
The machine is provided with an electronic
control board that perfectly regulates the
refrigeration system.
With this control board the machine operates in
two different modes:
•
FROZEN
– Once introduced the mix
inside the bowl, switch on the snowflake
button and regulate its consistency with
the
▼
e
▲
buttons (fig.27).
•
DEFROST
– This mode, once activated
by the waves button, reduces the
machine energy consumption; the
refrigerating system will automatically
cycle to maintain temperature below 2°C
(fig.9). Use this position when product
will not be requested for hours.
Important
Do not use FROZEN or DEFROST position with
water or sanitizer in the bowl, the machine will
be damaged.
NOTE: in order to activate the DEFROST mode
from the FROZEN one, is necessary to switch off
the snowflake button and then to switch on the
waves one; vice versa to go from the DEFROST
to the FROZEN, it’s necessary to shut off the
waves button and then to activate the snowflake
one.
Both the snowflake and the waves buttons
activate the refrigeration system, only when
they both are switched off (no LED lit up) the
system is not working.
!WARNING!
Every time the cover is removed during the unit
functioning, it is necessary to wait one minute
before repositioning it; failure to do so could
damage the unit
Fig. 26
Fig. 27
A
A
B
C
Summary of Contents for GT1 Push
Page 1: ...Data di emissione Febbraio 2019 Revisione 6 Pag 1 28 GT1 e GT2 Push Operator s manual ...
Page 22: ...Data di emissione Febbraio 2019 Revisione 6 Pag 22 28 14 WIRING DIAGRAM ...
Page 23: ...Data di emissione Febbraio 2019 Revisione 6 Pag 23 28 ...
Page 24: ...Data di emissione Febbraio 2019 Revisione 6 Pag 24 28 ...
Page 25: ...Data di emissione Febbraio 2019 Revisione 6 Pag 25 28 ...
Page 26: ...Data di emissione Febbraio 2019 Revisione 6 Pag 26 28 ...
Page 27: ...Data di emissione Febbraio 2019 Revisione 6 Pag 27 28 ...