15
ENGLISH
5
Out-let pipe sheath (Optional)
1
6
Out-let pipe Clasp (Optional)
1
7
Drain joint
1
8
Installation paper board (Optional)
1
9
Soundproof / insulation sheath (Optional)
1
10
Seal ring (Optional)
1
11
Expansible hook (Optional)
4
12
Installation hook (Optional)
4
13
Orice (Optional)
1
14
Frame (Optional)
1
15
Mounting screw (ST2.9X10-C-H)(Optional)
2
Note: Other necessary parts for the installation, besides the above mentioned, must be pro-
vided by the customer/installer.
3.3
Before installation
1.
Decide the correct carry-in path.
2.
According to the instructions, move
this unit as originally packaged as
possible.
3.
If the air conditioner is installed on a
metal part of the building, it must be
electrically insulated according to the
relevant electrical code.
4.
If installing in a lonely building or at
a high position where it is hot and
humid with frequent thunderstorm,
lightning-protection equipment is
necessary.
5.
Neccessary room
Fig.11
A
280
>2300
Fig.12
3.4
Indoor unit installation
Install the main body
The existing ceiling (to be horizontal)
1.
Please cut a quadrangular hole of
600 X 600mm in the ceiling according
to the shape of the installation paper
board. (Refer to Fig.13 & 14 for
product dimension)
• The center of the hole should be at
the same position of that of the air
conditioner body.
• Determine the lengths and outlets of
>1000
>1000
>1000
>1000
Outlet
Inlet
Outlet
Ground
Summary of Contents for EXC09JEIWI
Page 254: ...ZZZ HOHFWUROX FRP VKRS ...