Check that the mounting brackets are level.
They can be adjusted if necessary by using
the extra holes at the ends of the brackets.
Once the brackets are level, drill a pilot hole
through the central hole in the bracket and fit
the remaining screw
HOW TO FINISH UNPACKING
Place packed cooker next to the space in
which it will be installed. See Fig. 8.
Remove the cooker packing except for
bottom tray which should be left in position
until the cooker is ready to be fitted into its
cabinet.
Ensure the owner is given these operating
instructions.
59
Important: Switch off at mains, miniature
circuit breaker and, if appropriate, remove fuse
before commencing any electrical work.
Fig.8
INSTALLATION INSTRUCTIONS
Summary of Contents for COMPETENCE 5210 BU
Page 1: ...COMPETENCE 5210 BU Build Under Double Oven Operating And Installation Instructions 27 ...
Page 64: ...64 ...
Page 65: ...65 ...
Page 66: ...66 AEG5210 311359702 ...
Page 67: ...27 ...