CHECKING ELECTRICAL
CONNECTIONS
Confirm the cooker is correctly connected by
switching on and observing the various oven
functions indicators.
The electronic timer will flash on and off.
CONNECTING TO A HOB OR
COOKER POINT
Either follow in general terms the instructions
for connecting to the terminal block or refer to
the hob suppliers installation instructions.
NOTE: HOUSE CIRCUIT
Earth leakage / continuity tests must be carried
out before the cooker is connected to the mains
supply and re-checked after fitting.
62
INSTALLATION INSTRUCTIONS
Feed the cable through the cabinet and
arrange to route the cable away from
the cooker.
Summary of Contents for COMPETENCE 5210 BU
Page 1: ...COMPETENCE 5210 BU Build Under Double Oven Operating And Installation Instructions 27 ...
Page 64: ...64 ...
Page 65: ...65 ...
Page 66: ...66 AEG5210 311359702 ...
Page 67: ...27 ...