![Electro Industries Shark 100S Installation & Operation Manual Download Page 66](http://html.mh-extra.com/html/electro-industries/shark-100s/shark-100s_installation-and-operation-manual_2379713066.webp)
Doc
#
E145721
4 - 16
4: Electrical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
10. Service: Current Only Measurement (Dual Phase)
Select: "3 EL WYE" (3 Element Wye) in Meter Programming setup.
NOTE: Even if the meter is used for only Amp readings, the unit requires a Volts AN
reference. Please make sure that the Voltage input is attached to the meter. AC
Control Power can be used to provide the reference signal.
Electronic Circuits
Ia Ia Ib Ib Ic Ic
(+) (-) (+) (-) (+) (-)
Va Vb Vc Vref L1 L2 PE
A B N
A B N
Ia
Ib
20VAC
Minimum*
Power Supply Inputs
Summary of Contents for Shark 100S
Page 1: ...S h a r k 100S ...