![Electro Industries Shark 100S Installation & Operation Manual Download Page 50](http://html.mh-extra.com/html/electro-industries/shark-100s/shark-100s_installation-and-operation-manual_2379713050.webp)
Doc
#
E145721
3 - 6
3: Hardware Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3.3: Secure the Cover
1. Close the cover, making sure that power and communications wires exit the
submeter through the openings at the base (see Figure 3.6).
CAUTION! To avoid damaging components on the board assembly, make sure the
front cover support is in the upright position before closing the front cover.
2. Using the 3 enclosed screws, secure the cover to the base in three places - DO
NOT overtighten (you may damage the cover).
3. The unit can be sealed after the front cover is closed. To seal the unit, thread the
seal tag through the housing located between the bottom access holes (see figures
3.6 and 3.7).
4. Reattach the antenna, if applicable.
Figure 3.7: Submeter with Closed Cover
Closed
Lockable Revenue Seal
Screw
Summary of Contents for Shark 100S
Page 1: ...S h a r k 100S ...