Electro Industries/GaugeTech Shark 100 Quick Start Manual Download Page 1

     

Doc

#    

E145703   V.1.14     

          

             QS - 1

                      Shark® 100 Meter Quickstart

Electro 

Industries/GaugeTech

Powered by Innovation™

Shark® 100 Meter Quickstart Guide

CAUTION! 

Installation of the Shark® 100 meter must be performed only by qualified personnel who fol-

low standard safety precautions during all procedures. Those personnel should have appropriate training 
and experience with high voltage devices. Appropriate safety gloves, safety glasses and protective cloth-
ing are recommended.

 During normal operation of the Shark® meter, dangerous voltages flow through many parts of the unit, includ-
 ing: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules
 and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid
 contact with any current-carrying surfaces.

 Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can
 only be used as secondary protection. 

 IMPORTANT! 

Refer to your meter’s Installation and Operation Manual for additional safety warnings before 

 performing installation, wiring, or maintenance of your meter. See the link to the manual, below.

NOTE

: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter oper-

ation and programming information, refer to your meter’s

 Installation and Operation Manual

 and the 

Communica-

torPQA

®

 and MeterManagerPQA

® 

Software, EnergyPQA.com

®

 AI Driven EMS User Manual

 on EIG’s website. 

User Manual:

https://www.electroind.com/products/shark-100-power-and-energy-meter-transducer/

From the webpage, click Technical Documents>User Manual.

Software Manual:

https://www.electroind.com/products/communicatorpqa-software-application-5/

From the webpage, click Technical Documents>User Manual.

CommunicatorPQA

TM

 Setup Software:

https://www.electroind.com/products/communicatorpqa-software-application-5/

From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email sales@elec-
troind.com or call 516-334-0870.

All EIG’s metering and software products’ literature can be accessed from:

https://www.electroind.com/all-products/

For software and metering integration, EIG’s Technical Support Engineers are available on an hourly or daily basis to 
help with typical commissioning assistance, which includes:

• Verifying meter installation and wiring.

• Verifying proper system integration.

• Working with 3rd parties to ensure cross compatibility.

• Advising users on best practices for optimal implementation.

You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.

Summary of Contents for Shark 100

Page 1: ...uide gives basic installation wiring and programming instructions For additional meter oper ation and programming information refer to your meter s Installation and Operation Manual and the Communica torPQA and MeterManagerPQA Software EnergyPQA com AI Driven EMS User Manual on EIG s website User Manual https www electroind com products shark 100 power and energy meter transducer From the webpage ...

Page 2: ...Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Block FUSES 3 x 0 1A FUSE 3A C C B B A A N N lc HI LO lb HI LO la HI LO Earth Ground Earth Ground L Power Supply Connection N L GND N Vref Va Vb Vc LINE LOAD CT Shorting Blo...

Page 3: ...creen CT S The current Scaling is shown in the second line Press the DOWN ARROW to choose another value You can choose 1 10 or 100 7 Press the ENTER button to go to the PT numerator setting screen Pt n The current PT numerator is shown in the second line To change the setting press the DOWN ARROW until the value you want is displayed Then press the RIGHT ARROW to move to the next digit Repeat unti...

Page 4: ...creen Prot The meter s current Protocol is shown in the second and third lines Press the DOWN ARROW to choose another communication Protocol You can choose Mod rtU Modbus RTU choose this for RS485 connection Mod ASCI Modbus ASCII or dnp DNP 3 0 IMPORTANT If you are using the Ethernet option do not change any settings leave the protocol as Mod rtU 14 Press the ENTER button to go to the Scroll setti...

Page 5: ...0345 Pt d value as 69 Pt S value as 1000 For additional programming instructions for the faceplate buttons see Chapter 6 in the Shark 100 100T Meter Installation and Operation Manual Connect to the Meter through the RS485 Port The Shark 100 meter has a stan dard RS485 port that makes connec tion between the meter and a laptop PC very simple The Shark 200 meter s RS485 port uses standard 2 wire hal...

Page 6: ... product rs485 to usb communication converter 2 Open CommunicatorPQA software see page QS 1 for the download link 3 Click Connect in the Icon Bar 4 You will see the Connect screen Make sure your settings match the ones shown on the right use pull down menus 5 Click Connect The Device Status screen confirms the connection Click OK to close the Device Status screen 6 Click the Profile button on the ...

Page 7: ...y Voltage in Full Scale NOT Ratios NOTE You can also enter the Ratios for CT PT Numerator and Denominator and click the Update CT Update PT buttons to let the software calculate the Numerator Denominator and Multiplier for you You can then empty the Ratio fields and click the Update Ratio buttons to confirm the calculated set tings you will see the same ratios you initially entered See Chapter 9 i...

Page 8: ...he Device Designation field Note that it is important to name each meter individu ally since the meter name is used to name the log databases when logs are downloaded See Chapter 9 in the software manual for an explanation of the other settings in this screen IMPORTANT When you have made changes to the meter s Device Profile click Load Profile at the bottom of the Device Pro file screen to send th...

Reviews: