background image

16

Preparing the electrical 

connection

Make sure that the hole in the cable routing plate is 

facing the side where you want to insert the supply 

cable. If not, pull out and change over the plates.

DOCK INSTALLATION INSTRUCTIONS

Ethernet link (Use this option only if a WiFi 

internet connection cannot be established)

An Ethernet cable can be used to integrate the charger 

in the customer’s network. It is important to know the 

connections on the interface board for the Ethernet 

connection.

1

 

 LAN 1 RJ45 (charger communication over LAN)

2a

  

LAN 2 RJ45 (deactivated)

2b

 

LAN 2 LSA plus (deactivated)

3a

 

Clip for S/FTP cable

3b

 

Clip for S/FTP cable

4

  

Expansion terminal 

(charger communication for eSmartMeter)

5

 

GPIO

6

 

Welding detection

7

  LAN LSA-Plus to internet router

CAUTION

When inserting the cable  

routing plates, make sure 

that they are flush.

2a

90°

1

7

2b

3a

3b

4

6

6

Ethernet cable

8

7

6

5

4

3

2

1

Summary of Contents for innogy eBox professional

Page 1: ...Dock installation instructions...

Page 2: ...2 DOCK INSTALLATION INSTRUCTIONS...

Page 3: ...he site 12 Routing the connecting cable 12 Line selection 12 Tools needed 13 Information on mounting 14 Mounting the Dock on a wall 14 Preparing the electrical connection 16 Ethernet link optional 16...

Page 4: ...rovide these Dock installation Instructions to any future owner of the charger Note For your safety these devices must be stored installed used serviced and ifnecessary dismounted and disposed of prop...

Page 5: ...orm an installation following the procedures provided in this document contact Electrify America Electrify America is not responsible for any damages that may occur from custom installations that are...

Page 6: ...ference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the u...

Page 7: ...I Do not provide external GFCI on the supply power circuit as it may conflict with the internal GFCI of the charger Generalandelectrical specifications Dock Charging power up to 7 6kW up to 32A Mains...

Page 8: ...ted at a later time The Dock can be mounted on a suitable wall Included in delivery 1 Dock with 3 sealing plugs 1 installation instructions in English 3 round head screws 1 4 x 2 1 3 6 x 59 mm 3 unive...

Page 9: ...Operating temperature 22 F to 122 F 30 C to 50 C full load Voltage supply 240 Volt AC split phase 32A at 7 6kW Power supply Max 40A configurable Connected load Up to 7 6kW maximum load PRODUCT OVERVI...

Page 10: ...upply circuit to this device 2 Power supply line The cable routing plates may have to be switched over depending on whether the supply line is routed from the top or bottom 3 Ethernet cable Before con...

Page 11: ...r possible a cable size no greater than 10 AWG 6 mm CAUTION When multiple charging points are to be installed every tenth must be provided with additional earthing Compatible electricalnetworktype Con...

Page 12: ...he screws fully enter the channel strut nuts When fastening the Dock with the screws please make sure that the screws are fastened tightly into the bolt anchor wall To ensure adequate heat dissipation...

Page 13: ...display You will also need a side cutter a pair of round nose pliers and for cable assembly a cable knife and a MultiStrip 13 INSTALLATION INSTRUCTIONS Drilling template Side cutter Round nose pliers...

Page 14: ...loor Standard height 5 1 5m For full accessibility of charging only 3 9 1 15m DOCK INSTALLATION INSTRUCTIONS Information on mounting The Dock is secured through three screw holes to the wall To start...

Page 15: ...an 5 16 8mm bit and insert the provided wall plugs If the provided screws are unsuitable for the wall type at the chosen location use another type of suitable fastener INSTALLATION INSTRUCTIONS CAUTI...

Page 16: ...o integrate the charger in the customer s network It is important to know the connections on the interface board for the Ethernet connection 1 LAN 1 RJ45 charger communication over LAN 2a LAN 2 RJ45 d...

Page 17: ...d using the step drill Drill step by step to ensure that the hole is not too large and that there is no leakage after the cable gland has been installed Insert the M20 cable gland 02 Replace the routi...

Page 18: ...50 power plug and inserting it into a standard NEMA 14 50 outlet that is installed on a dedicated branch circuit with a 40 A circuit breaker in the feed panel If you choose to hard wire the unit to su...

Page 19: ...1 After the electrical tests switch OFF the circiut breaker 2 Put the contact guard back onto the Dock 3 Use the provided seal to secure the contact guard on the Dock so that it is not possible to rem...

Page 20: ...charger on port 1 on the left of the Dock After the electrical installation the charger can be clicked into the Dock Before mounting the charger make sure there is no voltage across the Dock by unplu...

Page 21: ...and properly aligned strongly press the charger onto the Dock 06 If necessary readjust the locking bracket until it is properly aligned Alignment marks triangular recesses are visible on the locking c...

Page 22: ...in place and the charger on the Dock 08 Power on the Dock circuit Assembly is done WARNING Make sure that the charger clicks correctly into the Dock Marking of the locking clip is in end position Set...

Page 23: ...eed the Electrify America app Linking during installation for private use This step can be performed by the end customer or an electrician linking the charger with the Electrify America app this will...

Page 24: ...itted the Ethernet cable to the local network Unscrew the cable gland s and remove the supply cable and if fitted the Ethernet cable s In the next step unscrew and remove the Dock Finally you may repl...

Page 25: ...25 NOTES...

Page 26: ...26 DOCK INSTALLATION INSTRUCTIONS...

Page 27: ...hanged reproduced or distributed without the prior agreement issued in writing by Electrify America Electrify America LLC 2003 Edmund Halley Drive 2nd Floor Suite 200 Reston VA 20191 27 LEGAL NOTICE I...

Page 28: ...8 06 19 Electrify America LLC 2003 Edmund Halley Drive 2nd Floor Suite 200 Reston VA 20191 In case of questions or problems with this product please call Electrify America Customer Assistance 1 833 53...

Reviews: