11-11
CONTROL SYSTEM
SM CN 1-E.1 GB
•
Deicing Operation Procedure
C O M P
R V
O F A N
E E V
O N
H E A T
C O O L
O N
O F F
E E V D e ic e rO p e n
A n y
T 1
T 2
T 3
T 3
T 1
1 2
0
T h re s h o ld
D T
m a x . 1 2 m in u te s
O C T
D e ic e F re q C h R V
T1=60 secondes;T2=36 secondes;T3=6 secondes
T1=50 secondes;T2=36 secondes;T3=6 secondes
11.1.20
Condensate Water Over Flow Protection
Level Connector Top View
P1
P4
P2
P3
Each of the pins P1, P2, P3 can have two options:
1 – When it is shorted with P4
0 – When it is not shorted to P4
P1
P2
P3
Level
Don’t care
Don’t care
1
Normal
Don’t care
Don’t care
0
Overflow
(*) 1- Pin P1, P2, or P3 is connected to P4.
0- Pin P1, P2 or P3 is not connected to P4.
For CN unit:
In case of vertical installation, change dipswitch 7 to OFF position to cancel Water Pump operation.
CONTENT
Summary of Contents for CN 25 DCI
Page 15: ...4 2 OUTLINE DIMENSIONS SM CN 1 E 1 GB 4 2 Outdoor Unit DCI 50 4 3 Outdoor Unit DCI 60 CONTENT ...
Page 16: ...4 3 OUTLINE DIMENSIONS SM CN 1 E 1 GB 4 4 Outdoor Unit DCI 72Z CONTENT ...
Page 44: ...8 1 WIRING DIAGRAMS SM CN 1 E 1 GB 8 WIRING DIAGRAMS 8 1 CN 25 35 50 60 70 DCI CONTENT ...
Page 92: ...13 12 EXPLODED VIEWS AND SPARE PARTS LISTS SM CN 1 E 1 GB 13 11 Outdoor Unit DCI 60 CONTENT ...
Page 94: ...13 14 EXPLODED VIEWS AND SPARE PARTS LISTS SM CN 1 E 1 GB 13 13 Outdoor Unit DCI 72Z CONTENT ...