elco Thision EVO WH 250-120 Operation And Installation Manual Download Page 9

Technical data 

THISION 

EVO

 

70

 

120 

Nominal heat output at 80-60ºC max/min

 

kW 

65.5

/1

5.6

 

111.

9

/

22.5

Nominal heat input Hi max/min

 

kW 

66.8

/1

6.0

 

114.3/

22.9

 

Efficiency at 80/60ºC

 

97.4

 

97.

9

 

Standstill losses 

 

W

 

81.0

 

92.7

 

Max. condensate flow

 

l/h 

4.

4

 

6.4

 

Gas consumption 

G20

 max/min (10,9 kWh/m

3

)

 

m

3

/h 

6.1/

1.

5

 

10.5/

2.1

 

Gas consumption LPG. max/min (12,8 kWh/kg)

 

kg/h 

5.2

/1.

3

 

8.9/1.

8

 

Gas pressure 

G20

 

mbar 

20 

20

25 

25 

Gas pressure LPG

 

mbar 

30/50 

30/50 

Maximum gas pressure

 

mbar 

50 

50

Flue gas temperature at 80/60ºC max/min

 

ºC 

60/57

 

63

/

56

 

Flue gas quantity max/min

 

m

3

/h 

98

/

22

 

168

/3

3

 

CO

2

 level natural gas max/min

 

8.

4/9.0

 

8.

4

/8.5 

CO

2

 level liguid gas 

LPG 

max/min

 

9.6/9.6

 

9.6/9.6

NOx level

 

mg/kWh 

39 

39 

CO level max/min

 

mg/kWh 

9

9/11

 

8

8/

5

 

Max. permissible flue resistance 

 

Pa 

244

 

134

 

Water volume

 

6.0

 

9.0

 

Water pressure max/min

 boiler  module

 

bar 

8

/1 

8

/1 

Max. water temperature (High limit thermostat)

ºC 

100 

100 

Maximum temperature setpoint

 

ºC 

90 

90

3.4 

4.8 

Electrical connection

 

230 

230 

Frequency

 

Hz 

50 

50

Mains connection fuse

 

10 

10 

IP class

 

IP

X4D

IP

X4D

Power consumption boiler max/min (excl. pump)

1

22

 

119

 

Weight (dry) with 250L cylinder

 

 

Noise level at 1 meter distance 

dB(A) 

55

57

 

-

 

Gas connection

R3/4" 

R1" 

Flue gas connection

mm 

100 

100 

Air intake connection (for room sealed use)

mm 

100 

100 

Condensate connection

 

mm 

22 

22 

CE-0063CM3576 

kg 

CE certification code 

PH value condensate

3.2

3.2

Weight (dry) with 500L cylinder

kg 

1

87.8

203.7

  

1

97.8

2

13.7

Weight (wet) with 250L cylinder

kg 

Weight (wet) with 500L cylinder

kg 

4

37

.8

4

53

.7

6

97

.8

7

13

.7

THISION 

EVO

 

Summary of Contents for Thision EVO WH 250-120

Page 1: ...Operation and Installation manual THISION EVO WH 08 2016 PAG THEWH01...

Page 2: ......

Page 3: ...0 21 Gas tightness check 21 Water heater shut down 21 Maintenance Checklist 25 Replacing the electrodes 25 Cleaning the condensate receptacle 26 Cleaning and refilling the syphon 26 Inspection of the...

Page 4: ......

Page 5: ...directive 2004 108 EEC EMC directive EN 483 Gas fired central heating boilers Type C boilers of nominal heat input not exceeding 70 kW EN 15420 Gas fired central heating boilers Type C boilers of nom...

Page 6: ...utory obligations This boiler has been tested and certified to comply with all necessary European directives and is CE marked and complies with 92 42 EEC Efficiency of Hot Water Boilers Directive 90 3...

Page 7: ...rol ling the speed of the fan As a re sult the venturi mixing system will adapt the gas ra o to the chosen fan speed in order to maintain the best possible combus on figures and therewith the best e c...

Page 8: ...installed from the system to the unit 1 230Vac electrical supply 2 Mains cold water supply 3 DHWS secondary flow pipework 4 DHWS secondary return pipework 5 Gas supply pipework 6 Condense drain pipewo...

Page 9: ...NOx level mg kWh 39 39 CO level max min mg kWh 99 11 88 5 Max permissible flue resistance Pa 244 134 Water volume l 6 0 9 0 Water pressure max min boiler module bar 8 1 8 1 Max water temperature High...

Page 10: ...us output at 60 C 250L storage Continuous operation at 60 C 1st hour continous output at 60 C 500L storage 10 min peak output at 60 C 500L storage L 687 818 L 1622 2413 L 1122 1913 10 Electrical Data...

Page 11: ...352 1 1 4 1 1 4 1 1 4 1 1 4 3 4 3 4 3 4 3 4 1 1 2 1 1 2 1 1 2 1 1 2 W 100 B1 D H1 H1 mm 1952 1821 1952 1821 11 J K L M N mm mm mm mm mm J K L M N 1100 1000 800 700 600 1100 1000 800 700 600 DHW Flow...

Page 12: ...ons 1 2 3 4 Condensate connection 5 After filling with water the syphon included in delivery should be installed to the connection 5 at the bottom of the water heater Connect the hose to the draining...

Page 13: ...nal regulations Construct the flue gas system as short as possible for maximum length see planner documentation Construct horizonal ways with a mini mum angle of 3 Air intake connection 8 The air inta...

Page 14: ...taining visibility iii Discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe is clearly visible tundish visible or not or onto a roof capable of withst...

Page 15: ...Sizing of copper discharge pipe D2 for common T P relief valve sizes Schematic discharge pipe arrangement Unvented Applications Worked example of discharge pipe sizing The example below is for a G1 2...

Page 16: ...16 Cylinder Controls Electrical Connections...

Page 17: ...been eliminated close the outlet Step 4 Check pipework for leaks Further Commissioning Once the system has been completely filled and vented the unit can be connected to the electrical supply All DHWS...

Page 18: ...nal posi on Make sure the syphon is filled before star ng the boiler in order to pre vent flue gases discharging through the condensate connec on Flue and air intake connec ons Check whether the flue...

Page 19: ...s in the display Choose set up confirm with OK button now the boiler load can be changed by rotating the wheel C and confirming the 50 setting with the OK button After checking the combustion values s...

Page 20: ...to full load and minimum load values Make sure that the boiler is set to automa c opera on and controller stop mode is disabled a er the combus on test is finished Combus on se ngs Adjustments must be...

Page 21: ...lt in a lockout no 28 The lockout should disappear as soon as the plug is placed back in posi on the boiler will restart Ionisa on electrode 4 Remove electrical connec on from the ionisa on electrode...

Page 22: ...1 sensor error 65 Room temperature 2 sensor error 70 Buffer storage tank temperature 1 sensor error 71 Buffer storage tank temperature 2 sensor error 72 Buffer storage tank temperature 3 sensor error...

Page 23: ...g temperature sensor error 324 BX same sensors 325 BX extension module same sensors 326 BX mixing group same sensors 327 Extension module same function 328 Mixing group same finction 329 Extension mod...

Page 24: ...less header address error 353 Common flow sensor B10 not available 371 Flow temperature 3 heating circuit 3 supervision 372 Limit thermostat heating circuit 3 373 Extension module 3 error collective e...

Page 25: ...quality of the system water as well as supply water Check the water flow rate through the boiler Check correct the combus on values at full and mimimum load with a combus on analyzer Check the gas pre...

Page 26: ...fresh water Mount the syphon back in the original posi on Inspec on of combus on chamber For inspec on of the combus on chamber the mixing system and burner must be disassembled Switch o the boiler a...

Page 27: ...yzer for example Test points Bolt connections Gaskets of mixing system etc Safety devices Check the functionality and the settings of all safety devices connected Consult the chapter commissioning Che...

Page 28: ...s p m u P Safety devices a W C g n i t t e s t i m i l h g i H ter flow sensor checked d e k c e h c r o s n e s s a g e u l F C g n i t t e s r e t i m i l p m e T Min gas pressure switch setting mba...

Page 29: ...f T lics Low velocity header Water pboiler kPa Plated heat exchanger Water flow m3 h Bypass boiler Pump setting Other Safety devices High limit setting C Water flow sensor checked Temp limiter settin...

Page 30: ...Service ELCO UK 3 Juniper West Fenton Way Southfields Business Park Basildon Essex SS15 6SJ Tel 01268 546700...

Reviews: