
Commissioning
Commissioning protocol
29
Commissioning Protocol THISION
EVO WH
Project
t
c
e
j
o
r
P
e
p
y
t
r
e
li
o
B
s
s
e
r
d
d
A
r
e
b
m
u
n
l
a
ir
e
S
y
ti
C
r
a
e
Y
e
t
a
D
]
W
k
[
)
i
H
(
d
a
o
l
l
a
n
i
m
o
N
r
e
e
n
i
g
n
E
]
W
k
[
)
i
H
(
t
u
p
t
u
o
l
a
n
i
m
o
N
System
[
e
r
u
s
s
e
r
p
r
e
t
a
W
bar] Installati-
on:
Roof top
r
o
o
lf
d
n
u
o
r
G
]
-[
H
p
r
e
t
a
W
t
n
e
m
e
s
a
B
]
H
d
º[
s
s
e
n
d
r
a
h
r
e
t
a
W
.
..
..
..
..
..
..
..
..
..
..
..
..
:
r
e
h
t
O
]
l/
g
m
[
e
d
ir
o
l
h
c
r
e
t
a
W
Water
∆
-
u
a
r
d
y
H
]
C
º[
d
a
o
l
ll
u
f
T
lics:
Low velocity header
Water
∆
p
boiler
[kPa]
Plated heat exchanger
Water flow
[m
3
/h]
Bypass boiler
Pump setting
[-]
Other: .........................
Safety devices
High limit setting
[ºC] Water flow sensor checked
Temp. limiter setting
[ºC] Fluegas sensor checked
Min. gas pressure switch setting
[mbar] Water flow switch checked
Ignition time burner
[sec]
Combustion analysis
100% load
50% load
Min. load
Gas consumption
[m
3
m
[
]
h
/
3
/h]
[m
3
/h]
]
r
a
b
m
[
]
r
a
b
m
[
]
r
a
b
m
[
e
r
u
s
s
e
r
p
s
a
G
CO
2
]
%
[
[%]
[%]
O
2
]
%
[
[%]
[%]
]
m
p
p
[
O
C
[ppm]
[ppm]
]
m
p
p
[
x
O
N
[ppm]
[ppm]
T
atmospheric
]
C
º[
[ºC]
[ºC]
T
fluegas
]
C
º[
[ºC]
[ºC]
T
water, flow
]
C
º[
[ºC]
[ºC]
T
water, return
]
C
º[
[ºC]
[ºC]
Ionisation current
[µA]
[µA]
[µA]
p
fan
]
r
a
b
m
[
[mbar]
[mbar]
p
top panel
]
r
a
b
m
[
[mbar]
[mbar]
p
combustion chamber
]
r
a
b
m
[
[mbar]
[mbar]
Remarks
Summary of Contents for Thision EVO WH 250-120
Page 1: ...Operation and Installation manual THISION EVO WH 08 2016 PAG THEWH01...
Page 2: ......
Page 4: ......